Drilling planned

Kalgoorlie Miner - - MINE TALK -

Ram Re­sources has an­nounced the com­ple­tion of ground-based elec­tro­mag­netic sur­veys and follow-up soil sam­pling at its Fraser Range South Project.

The EM survey iden­ti­fied two high-pri­or­ity con­duc­tors, with soil sam­pling con­firm­ing the pres­ence of nickel-in-soil anoma­l­ism above and within the vicin­ity of th­ese tar­gets.

The bedrock con­duc­tors are less than 2km from Sir­ius Re­sources’ Crux and Cen­tauri nickel prospects.

Ram has pro­posed drilling of the tar­gets will be­gin in the March quar­ter after the re­ceipt of all rel­e­vant ap­provals.

The project sits within the Dundas Na­ture Re­serve (B Class), which does not re­strict ex­plo­ration, but does mean ad­di­tional ap­provals for work pro­grams are re­quired.

Newspapers in English

Newspapers from Australia

© PressReader. All rights reserved.