Moss­man Mill through­put for the week was 48,309 tonnes of cane at an av­er­age crush­ing rate of 341 t/hr with plant avail­abil­ity over bud­get. It was a good through­put for the week with a planned main­te­nance day in­cluded. Most through­put stop­pages re­volved around the feed­ing sta­tion in par­tic­u­lar cane hang­ing up in the bins, tip­pler hy­draulics, and the pre­pared cane el­e­va­tor. Main­te­nance day fo­cus was on the tip­pler hy­draulics, cane shred­der, evap­o­ra­tors and re­pair­ing boiler leaks. The boiler work run over the planned time and de­layed the fac­tory restart from main­te­nance. The CCS lev­els have re­mained steady in both sup­ply districts. CCS for the week av­er­aged 11.86. CCS av­er­age to date is 11.52. To­tal cane crushed to date is 790,995 tonnes.