Eicher part­ners with Bangalore In­ter­na­tional Air­port

Commercial Vehicle - - NEWS -

VE Com­mer­cial Ve­hi­cles (VECV) is sup­port­ing a ma­jor ex­pan­sion ex­er­cise un­der­taken by Bangalore In­ter­na­tional Air­port Ltd (BIAL) for the earth­works of the sec­ond run­way. The ex­er­cise is in con­nec­tion with the sec­ond ter­mi­nal (T2), and in­cludes the sec­ond run­way. Var­i­ous cor­re­spond­ing up­grades are also a part of the ex­er­cise. A fleet of 46 Eicher Pro6025T tip­pers are be­ing op­er­ated by two fleet op­er­a­tors, SVEC and RBR. SVEC is op­er­at­ing 30 units, and RBR is op­er­at­ing 16 units. For ef­fi­cient sup­port, VECV has set up a four-con­tainer on site ser­vice sta­tion, and a cov­ered work­shop that can ac­com­mo­date four tip­pers at a time. In­tended to cater to all type of air­craft in all weather con­di­tions with an as­so­ci­ated par­al­lel taxi­way, two cross field taxi­ways on the east con­nect­ing the new run­way to the ex­ist­ing north run­way, T1 apron, the project is ex­pected to be com­pleted by Septem­ber 2019. The project com­menced in Fe­bru­ary 2016.

Newspapers in English

Newspapers from India

© PressReader. All rights reserved.