Spark Minda in­au­gu­rates tech cen­tre

Commercial Vehicle - - WHAT'S INSIDE -

Spark Minda has in­au­gu­rated a tech cen­tre at Pune. It is equipped with mod­ern test and mea­sure­ment equip­ment, de­vel­op­ment tools and a fully op­er­a­tional lab­o­ra­tory to sup­port the de­vel­op­ment of embed­ded soft­ware and hard­ware. In­clud­ing an en­gi­neer­ing and de­sign of­fice, the tech cen­tre, built over a space of 40,000 sq. ft., also in­cludes EMI-EMC (Elec­tro­mag­netic in­ter­fer­ence & Elec­tro­mag­netic com­pat­i­bil­ity) test fa­cil­ity to cater to a com­plete suite of de­sign and prod­uct val­i­da­tion tests. To have

400 em­ploy­ees, the cen­tre, apart from strength­en­ing the Group’s im­age as a com­plete sys­tem solutions provider, will nur­ture in­no­va­tions and cre­ate break­through solutions. In other news, Spark Minda has com­mis­sioned its third die-cast­ing plant at Chakan, Pune. Con­tain­ing a test lab with x-ray, met­al­lurgy, me­chan­i­cal and en­vi­ron­men­tal test equip­ment, the plant, mea­sur­ing 10 acres of land, is laced with grav­ity die cast­ing, low pres­sure die cast­ing, pre­ci­sion ma­chin­ing and pow­der coat­ing fa­cil­ity. Mark­ing an in­vest­ment of Rs.100 crore for Phase 1, the plant will lead to a rise in die cast­ing ca­pac­ity from 8,500 MT to 9,700 MT.

Newspapers in English

Newspapers from India

© PressReader. All rights reserved.