The ma­jor growth driv­ers

HT Estates - - HTESTATES -

on built, op­er­ate and trans­fer (BOT) model. As per con­ces­sion agree­ment with JP In­frat­ech P Ltd, YEIDA had to give five land parcels of 500 hectares each at five dif­fer­ent places such as Noida, Mirza­pur, Ja­gan­pur, Tap­pal (Aligarh) and Agra, to­talling 2500 hectares. Be­sides, JP In­frat­ech has also got right to col­lect the toll for 36 years. Once the con­ces­sion pe­riod ex­pires, it will hand over the ex­press­way to the YEIDA. Ut­tar Pradesh govern­ment - un­der Ut­tar Pradesh Ex­press­way (Levy of Tolls and fix­ing of Fees and re­al­i­sa­tion there of) Rules, 2010 – has power to fix the toll limit to be col­lected from the com­muters and Jaypee can’t ex­ceed that. Ya­muna Ex­press­way area is strate­gi­cally con­nected with a num­ber of ex­press­ways pro­posed or un­der con­struc­tion in NCR such as East­ern Pe­riph­eral Ex­press­way and Khur­jaPal­wal Ex­press­way. The Ya­muna Ex­press­way cor­ri­dor is bound to have huge im­pact on the eco­nomic and in­dus­trial growth not only of Ut­tar Pradesh but also of ad­join­ing states such as Ra­jasthan, Mad­hya Pradesh and Haryana in the com­ing years. Ya­muna Ex­press­way is a 165 km sixlane, ac­cess con­trolled, el­e­vated ex­press­way Lane width: 3.75 m each

PHO­TOS: BURHAAN KINU

Newspapers in English

Newspapers from India

© PressReader. All rights reserved.