BUILD­ING FEA­TURES

Africa Outlook - - Construction -

Un­ri­valled lo­ca­tion in the heart of West­lands

Triple height en­trance lobby

Dou­ble-glazed so­lar ef­fi­cient glass (en­ergy sav­ing of –35 per­cent)

Gran­ite/Mar­ble lob­bies on all lev­els

Six high-speed lifts (3m/sec­ond) of 21 pas­sen­ger ca­pac­ity; av­er­age wait­ing time (36 sec­onds) in-line with Euro­pean stan­dards EN 81.1 and EN 81.2

Male/Fe­male WCs on each floor

Rain­wa­ter har­vest­ing as stan­dard

On­site treated bore-hole

Three standby gen­er­a­tors for 100 per­cent load back up (2 x 500 KVA + 1 x 350 KVA back-up ca­pac­ity)

Con­ven­tional and mech­a­nised park­ing sys­tems giv­ing 333 spa­ces)

Sky Café

State-of-the-art gym

Newspapers in English

Newspapers from UK

© PressReader. All rights reserved.