Com­fort Zone Slip­pers

These cozy slip-ons are so com­fort­able guys will hate tak­ing them off! The navy tweed yarn gives them a hand­somely rugged look to suit his style.

Crochet! - - Contents - DE­SIGN BY LEN ASK VA GER SON FOR AN­NIE’ S SIG­NA­TURE DE­SIGNS

FIN­ISHED SIZES

In­struc­tions given fit man’s shoe size 8/ 9; changes for 10/ 11 and 12/ 13 are in [ ].

FIN­ISHED MEA­SURE­MENTS

Slip­per length: 9 inches [ 93/4 inches, 101/2 inches] Foot length: 10–101/2 inches [101/2– 11 inches, 111/4– 113/4 inches]

MA­TE­RI­ALS

• Ply­mouth Yarn En­core Tweed medium ( worsted) weight acrylic/ wool/ rayon yarn ( 31/2 oz/ 200 yds/ 100g per ball):

1 [ 2, 2] ball( s) # 5854 navy • Size G/ 6/ 4mm cro­chet hook or size

needed to ob­tain gauge • Ta­pes­try nee­dle • Stitch mark­ers

GAUGE

19 sc = 4 inches; 21 sc rows = 4 inches

PAT­TERN NOTES

Weave in loose ends as work pro­gresses. Join with slip stitch as in­di­cated un­less oth­er­wise stated. Do not join rounds un­less oth­er­wise stated. Use stitch marker to mark rounds and move marker as work pro­gresses.

SLIP­PER

Make 2.

Sole

Row 1: Beg at heel, ch 13 [ 15, 15], sc in 2nd ch from hook, sc in each rem ch across, turn. ( 12 [ 14, 14] sc) Row 2: Ch 1, sc in each sc across, turn. Rep row 2 un­til piece mea­sures 5 [ 51/2, 6] inches. Row 3: Ch 1, 2 sc in first sc, sc in each sc across to last sc, 2 sc in last sc, turn. ( 14 [ 16, 16] sc) Rep row 2 un­til piece mea­sures 83/4 [ 91/2, 101/4] inches. Row 4: Ch 1, sc dec ( see Stitch Guide) in next 2 sc, sc in each of next 10 [ 12, 12] sc, sc dec in next 2 sc, turn. ( 12 [ 14, 14] sc) Row 5: Ch 1, sc dec in next 2 sc, sc in each of next 8 [ 10, 10] sc, sc dec in next 2 sc. Fas­ten off. ( 10 [ 12, 12] sc)

Side

Rnd 1: Now work­ing in rnds, work­ing in op­po­site side of foun­da­tion ch of heel, join ( see Pat­tern Notes) yarn in 6th [ 7th, 7th] ch, ch 1, sc in same ch as beg ch- 1, sc in each of next 5 [ 6, 6] chs, work 36 [ 40, 44] sc evenly sp along side edge of Sole, 10 [ 12, 12] sc across toe front edge, 36 [ 40, 44] sc evenly sp along op­po­site side edge of Sole, join in beg sc. ( 96 [ 106, 114] sc) Rnds 2–8 [2–9, 2–9]: Ch 1, work­ing in back lp ( see Stitch Guide) only, sc in each st around, do not join, place stitch marker ( see Pat­tern Notes). At the end of rnd 8 [ 9, 9], fas­ten off. Move stitch marker to 21st [ 25th, 27th] sc of rnd 8 [ 9, 9].

Top

Row 1 (RS): Now work­ing in rows, ch 22 [ 24, 26], sc in 2nd ch from hook, sc in each of next 19 [ 21, 23] chs, place stitch marker, 4 sc in last ch ( toe), place stitch marker, work­ing on op­po­site side of foun­da­tion ch, sc in each of next 20 [ 22, 24] chs, turn. ( 44 [ 48, 52] sc) Row 2 ( WS): Work­ing in front lp ( see Stitch Guide) only, ch 1, sc in each st to marker, 2 sc

in next st, sc in each st to 1 st be­fore marker, 2 sc in next st, sc in each rem st across, turn. ( 46 [ 50, 54] sc) Row 3: Work­ing in back lp only, ch 1, sc in each st to marker, 2 sc in next st, sc in each st to 1 st be­fore marker, 2 sc in next st, sc in each rem st across, turn. ( 48 [ 52, 56] sc) Row 4: Rep row 2. ( 50 [ 54, 58] sc) Row 5: Rep row 3. ( 52 [ 56, 60] sc) Row 6: Rep row 2, do not fas­ten off. ( 54 [ 58, 62] sc)

Join­ing

Row 7: Hold­ing Top on Side at marker, work­ing through back lps only of Top and both lps on Side, ch 1, sc in each of next 54 [ 58, 62] sts, do not fas­ten off.

Trim

Rnd 1: Ch 1, work­ing in ends of rows across Top, work 10 [ 11, 12] sc evenly sp across, work­ing in sts of Side, [ sc in each of next 2 sc, sk next sc] around back of Slip­per to first st of rnd 1, join in beg sc. Rnd 2: Ch 1, re­verse sc ( see Stitch Guide) in each sc of rnd 1, join in beg sc. Fas­ten off.

Newspapers in English

Newspapers from USA

© PressReader. All rights reserved.