21

Ultimate Diesel Builder's Guide - - Udbg Tech -

Next, Bosie fit­ted the in­jec­tors with new O-rings and re­in­stalled them, the injector hold downs, injector feed tubes (which were matched with the same cylin­der they fed prior to tear­down), and the fuel rail. Af­ter that, the Stage 1 push rods from Scheid were in­stalled, along with the rock­ers.

Newspapers in English

Newspapers from USA

© PressReader. All rights reserved.