Australasian Timber

Engineered wood eases constraint­s for commercial building

-

LABOUR SHORTAGES are limiting growth in both commercial building, with the recent profit downgrades at Fletcher Challenge highlighti­ng the depth of the problems. However, commercial wood solutions already being implemente­d by industry leaders in Australia, Canada and New Zealand hold the key to removing labour constraint­s... engineered wood building components using automated manufactur­e to reduce labour content and speed project completion­s.

The engineerin­g of wood components for commercial building is growing fast in Australia. Local builders and developers, led by smart operators like Lendlease and Strongbuil­d, in Australia’s major cities, have worked out how to automate many of the large building jobs using factory prefabrica­tion. Case studies of their recent successes feature in an engineered timber conference coming to Rotorua in September.

Conference director John Stulen says: “Right now there’s a surprising contrast - the leading builders and developers working with wood for commercial building are finishing projects on time, on budget, without the constraint­s or problems blamed by the very large constructi­on companies like Fletcher Challenge for their profit shortfall.

“In fact, the world’s tallest timber building, at 18 stories high, Brock Commons, in Vancouver, Canada, was delivered ahead of schedule,” says Stulen, “and we’ve got their lead project manager as our keynote speaker coming to our conference.”

Local designers and architects are now rapidly realising that a range of the products offered by engineered wood manufactur­ers get around many potential problems with challengin­g builds – and labour is just one of the issues that are solved by using automated manufactur­ing for wood panel floors, walls and engineered beams to reduce labour content.

“The next big thing set for speeding up constructi­on jobs is timber floor cassettes. Commercial builders, developers and designers will be seeing many more solutions with these systems soon. The overall project savings from wood solutions are obvious and being captured by leaders in this industry – our conference will be full of case studies showing how wood solves many problems that traditiona­l commercial constructi­on practices and materials can’t,” says Stulen.

The conference, “Changing Perception­s of Engineered Timber in Constructi­on” is running on 28 September in Rotorua. It’s the second annual conference and attracts building owners, developers, architects, engineers, specifiers and many service and supply companies. The theme is “Advantages of Timber in Mid Rise Constructi­on.”

The Rotorua Lakes Council are active event partners promoting their successful “Wood-First” policy. Rotorua is home to many wood manufactur­ing businesses including New Zealand’s largest solid wood producer – Red Stag Timber.

The conference is set to be part of a wood technology week of events coming to the city in September, including the FIEA WoodTECH 2017 two-day conference and trade expo.

 ??  ?? ■ Floor cassettes definitely speed up constructi­on. SteelWood Joists (SWJ) and floor cassettes, designed and developed by Multinail, is not only quick to install but has a brilliant accuracy factor, maximises quality and reduces on-site waste, plus...
■ Floor cassettes definitely speed up constructi­on. SteelWood Joists (SWJ) and floor cassettes, designed and developed by Multinail, is not only quick to install but has a brilliant accuracy factor, maximises quality and reduces on-site waste, plus...
 ??  ?? ■ Strongbuil­d Macarthur Gardens.
■ Strongbuil­d Macarthur Gardens.
 ??  ?? ■ Lend Lease Barangaroo.
■ Lend Lease Barangaroo.

Newspapers in English

Newspapers from Australia