4 floor­ing tips

FOR BEST-EVER RE­SULTS

Better Homes and Gardens (Australia) - - Room Refresh -

1 Un­roll your cho­sen floor­ing in the in­stal­la­tion area and let it ac­cli­ma­tise to a tem­per­a­ture be­tween 15-28˚C for at least 24 hours prior to be­ing loose-laid.

2 Be­fore in­stal­la­tion, in­spect the new floor­ing in a well-lit area for any de­fects, dam­age or dif­fer­ences in shad­ing.

3 Check the pat­tern line up and shad­ing to see if any sheets need to be turned or re­versed.

4 In­stall cab­i­netry prior to lay­ing the floor cov­er­ing. Also re­move the skirt­ing and un­der­cut door­frames be­fore you be­gin.

Psst, this prod­uct is also an ideal loose-lay floor­ing so­lu­tion for wet ar­eas such as the kitchen. Just pick the de­sign you love!

Newspapers in English

Newspapers from Australia

© PressReader. All rights reserved.