TOWER MOVING BACK TO VERTICAL POSITION
The new and longer piles will stop the settling at the low side, while the opposite side will continue to sink, making the tower more vertical. Gradually, more piles will be installed at the bedrock.
The new and longer piles will stop the settling at the low side, while the opposite side will continue to sink, making the tower more vertical. Gradually, more piles will be installed at the bedrock.