Equipment Hire
SHORT to medium term water needs can be met effectively by hiring water filtration and treatment plants.
MAK Water’s versatile filtration plants can suit applications from 10cum per day to several thousand per day.
Typically, MAK Water’s filtration plants are used for drinking water in compliance with the Australian Drinking Water Guidelines, and include pre-filtration and disinfection.
They can also be modified for other applications such as de-watering and the provision of process water.
The plants are generally containerised, which means that all they need is a feed water supply and power, and so they can be set up within a matter of hours.
MAK Water also operates a hire fleet of modular sewage/wastewater treatment plants that are designed for the versatile applications of mining treating from 10 to 200cum per day of standard strength sewage.
A temporary water treatment plant can be used for construction projects, plant commissioning, planned outages, equipment replacement, equipment failure, extra capacity and many more applications.
MAK Water understands the often urgent nature of hire projects and moves fast to review client water quality data and to enable the rapid deployment of the best possible equipment solution.
Typically, MAK Water offers short term usage solutions of up to 18 months, however longer-term arrangements can be accommodated.
The company can supply within two weeks from receipt of firm commitment, depending on availability at the time of the order.