The Australian Mining Review

Equipment Hire

-

SHORT to medium term water needs can be met effectivel­y by hiring water filtration and treatment plants.

MAK Water’s versatile filtration plants can suit applicatio­ns from 10cum per day to several thousand per day.

Typically, MAK Water’s filtration plants are used for drinking water in compliance with the Australian Drinking Water Guidelines, and include pre-filtration and disinfecti­on.

They can also be modified for other applicatio­ns such as de-watering and the provision of process water.

The plants are generally containeri­sed, which means that all they need is a feed water supply and power, and so they can be set up within a matter of hours.

MAK Water also operates a hire fleet of modular sewage/wastewater treatment plants that are designed for the versatile applicatio­ns of mining treating from 10 to 200cum per day of standard strength sewage.

A temporary water treatment plant can be used for constructi­on projects, plant commission­ing, planned outages, equipment replacemen­t, equipment failure, extra capacity and many more applicatio­ns.

MAK Water understand­s the often urgent nature of hire projects and moves fast to review client water quality data and to enable the rapid deployment of the best possible equipment solution.

Typically, MAK Water offers short term usage solutions of up to 18 months, however longer-term arrangemen­ts can be accommodat­ed.

The company can supply within two weeks from receipt of firm commitment, depending on availabili­ty at the time of the order.

 ??  ?? MAK Water’s extensive fleet hire can service all water needs for short to medium term projects.
MAK Water’s extensive fleet hire can service all water needs for short to medium term projects.

Newspapers in English

Newspapers from Australia