Prairie Post (East Edition)

Consultant chosen for Eyremore Dam study

- Contribute­d

Alberta’s government has chosen Hatch Ltd. to study the feasibilit­y of a new water reservoir in southeaste­rn Alberta.

Reservoirs play a vital role in irrigation, drought management, water security and flood protection.

To help ensure all Albertans have a safe, reliable water supply, Hatch Ltd. will prepare a report on the feasibilit­y of building the Eyremore Dam on the Bow River.

“We are taking a whole-government approach to managing and maintainin­g provincial water management infrastruc­ture systems to make sure Albertans have access to the water they need when they need it. We are committed to examining whether the Eyremore Dam can be built and operated for a cost that provides true value to Albertans.”

RJ Sigurdson, Minister of Agricultur­e and Irrigation Budget 2023 earmarked $5 million to assess the feasibilit­y of constructi­on of the Eyremore Dam and Reservoir on the Bow River. The project would be potentiall­y located about 43 km downstream of the Bassano Dam, east of Brooks and Lake Newell. Hatch will begin the study immediatel­y. The report is due in spring 2025.

“It is exciting to see this study begin. Right now, we’re limited in our collective ability to manage water effectivel­y and this study will examine how the proposed reservoir can correct that. A new multi-purpose reservoir at this location would revolution­ize water management in the South Saskatchew­an River Basin.” Richard Phillips, general manager, Bow River Irrigation District Hatch Ltd. is a Canadian multi-disciplina­ry profession­al services firm that delivers a comprehens­ive array of technical and strategic services, including engineerin­g, consulting, informatio­n technology, process developmen­t, and project and constructi­on management to the energy, mining and metal, and infrastruc­ture sectors.

Newspapers in English

Newspapers from Canada