Some of the conclusion­s in Accufact’s scathing report on Enbridge’s proposal for Line 9B, which the company said it looks forward to disputing in public hearings later this month.

Stress corrosion cracks are prevalent and high-risk along Line 9.

Cracks are most likely to fail as ruptures.

Crack detection tools “appear” to still be a “research experiment.”

Changing types of crude in the pipe will speed up crack growth.

Enbridge has failed to heed some recommenda­tions from U.S. regulators in the aftermath of a catastroph­ic 2010 spill in Michigan.

Something “appears very wrong” with the company’s risk assessment.

Emergency response plans and times aren’t adequate.

Enbridge’s leak detection won’t detect a rupture quickly.

Volumes that would spill in the event of a rupture are “in all probabilit­y understate­d.”