Toronto Star

Transport Canada to conduct its own review of Boeing 737 Max

- BRUCE CAMPION-SMITH

OTTAWA— Transport Canada is conducting its own review of design changes to the Boeing 737 Max aircraft to ensure that the “safety risks” identified in two fatal crashes are addressed before the jet is allowed to fly again in Canadian skies.

That return to service will only happen “once there is confidence that the planes are safe to do so and all concerns have been addressed,” Nicolas Robinson, Transport Canada’s director general of civil aviation, told reporters after attending a Thursday meeting of aviation regulators.

Transport Canada was among 33 regulators from around the globe that took part in a day-long session hosted by the U.S. Federal Aviation Administra­tion in Fort Worth, Texas, to share informatio­n on evaluating changes to the Boeing 737 Max design — these include software changes — that will get it back into service.

Since the plane’s manufactur­er is based in the U.S., the FAA has responsibi­lity for certifying changes proposed by Boeing to address the jet’s design problems.

But Robinson made clear that Canada will be doing its own “risk-based validation” of the FAA’s review of the aircraft before it lifts the restrictio­n that has grounded the jet.

“Transport Canada will be doing its own review of these design changes prior to accepting them on Canadian-registered aircraft by our own validation process,” he told a conference call.

“Our review of the Max design changes, the software upgrade is already underway,” Robinson said.

“The validation will be completed once we are certain that the safety risks that were presented by these two incidents have been addressed,” Robinson said.

The 737 Max, the latest model of a jet that first flew in the 1960s, is operated by WestJet, Air Canada and Sunwing here in Canada. The carriers have removed the Max model from their flight schedules for much of the summer.

He said it is “premature” for airlines to make any further decisions about their schedules, saying that Transport Canada is still waiting on further informatio­n from both the FAA and Boeing for its review

“This is not about a meeting a deadline; it’s about getting safety done properly. It’s a process and it will be done when we feel comfortabl­e,” Robinson said.

The FAA wasn’t making any promises either when the Boeing 737 Max would be allowed to resume flights in the United States, a key step to resuming operations in other jurisdicti­ons.

“The only timetable I have is the analysis that says the Max is good to fly and safe to fly,” Daniel Elwell, acting FAA administra­tor, told reporters in his own briefing after the meeting.

“We are going through an incredibly intensive and robust process to make the safety case to unground the Max,” he said. “We won’t unground the Max until we’ve made that safety case,” Elwell said.

Instead, he suggested there’s much work yet ahead. Boeing has yet to submit a final applicatio­n outlining changes to a software system on the 737 Max jets blamed as a factor in the two fatal crashes that forced the worldwide grounding of the aircraft in March.

Once that is submitted, the FAA will do risk assessment­s and analyses, weigh informatio­n from other regulators, put the changes to the test in a modified 737 “before making the decision to return the aircraft to service,” Elwell said.

“Internatio­nally, each country has to take its own decision, but FAA will make available to its counterpar­ts all that we have learned, all that we have done,” Elwell said.

The aircraft was grounded in Canada and around the globe in March following two crashes in Indonesia and Ethiopia that, taken together, killed 346 passengers and crew.

The investigat­ions have focused on a piece of software introduced on the Max because of design changes that altered its flying characteri­stics from earlier 737 models.

That software, known as the manoeuvrin­g characteri­stics augmentati­on system, would automatica­lly push the nose down if it detected the risk of an aerodynami­c stall. But it’s suspected that erroneous air data caused the system to needlessly trim the nose down in both accidents, leaving the pilots in a tug-of-war with the aircraft that ended with catastroph­ic results.

Boeing has been working on changes to that software and new cockpit warnings and revamped training for pilots who fly the jet.

In a statement Thursday evening, Boeing said it appreciate­d the FAA’s move to bring together regulators “to share informatio­n and discuss the safe return to service of the 737 MAX.

“Once we have addressed the informatio­n requests from the FAA, we will be ready to schedule a certificat­ion test flight and submit final certificat­ion documentat­ion,” the aerospace manufactur­er said.

Elwell predicted that the investigat­ions will ultimately show that a host of factors led up to both crashes.

Transport Minister Marc Garneau has said that the federal government may require Canadian pilots to undergo simulator training before it gives the Max the green light to resume flights. Robinson said there are “many factors” to be considered before deciding what the requiremen­ts will be for new training on the Max, including the issue of simulator sessions.

Elwell said that the FAA has not yet made any decisions on that front for U.S. pilots, saying the agency’s safety analysis “will dictate the training required.”

“It remains to be seen whether there will be simulator training of any kind,” he said, adding that as a former commercial pilot himself, “you can never practice certain procedures too much.”

As the agency that certified the aircraft in the first place, the FAA has found itself under the microscope amidst questions that it has become too cosy with Boeing.

But Robinson said that Canada still has “full confidence” in the FAA and its certificat­ion of U.S.-designed aircraft.

The FAA was also the last major regulator to ground the aircraft — this was done hours after Canada did — prompting what Elwell said were “frank” questions at the day’s meeting about that decision.

“This is not about a meeting a deadline; it’s about getting safety done properly.” NICOLAS ROBINSON TRANSPORT CANADA

 ?? GETTY IMAGES/TNS FILE PHOTO ?? Boeing’s 737 Max aircraft have been grounded worldwide since March.
GETTY IMAGES/TNS FILE PHOTO Boeing’s 737 Max aircraft have been grounded worldwide since March.

Newspapers in English

Newspapers from Canada