China Business and Market

Research on Intelligen­t Procuremen­t and Distributi­on of Power Materials Based on the Theory of Constraint­s

- FAN Jiang-dong,XU Jian-bin and SUN Xiao-jiang

[20]许光泞,肖志勇,俞金寿.应用自适应遗传算法解­决集装

[J].控制与决策,2007(11):1 280- 1 283,箱装载问题

1 288. [21]张德富,彭煜,朱文兴,陈火旺.求解三维装箱问题的混­合模拟退火算法[J].计算机学报,2009,32(11):2 1472 156. [22]张磊,袁建清,郑磊.汽车整车配载与运输路­线优化方案及算法研究[J].计算机技术与发展,2011,21(6):219222. [23]牟欣.物流配送中的车辆路径­与车辆装载整合优化问­题

研究[D].重庆:重庆大学,2008. [24]王超,金淳,韩庆平.三维装载与CVRP

联合多目标优化问题的­模型及算法[J].控制与决策,2016,31(5):929934. [25]杨广全,马玉坤,刘飞.基于遗传算法的集装箱­装车配载

方案的优化[J].中国铁道科学,2014,35(6):124-130. [26]BODIN L,GOLDEN B,ASSAD A,BALL M.Routing and scheduling of vehicles and crews:the state of art[J]. Com⁃ puters & operations research,1983(10):63-211. [27]BAKER M B,AYECHEW M A.A genetic algorithm for the vehicle routing problem[J].Computers & operations re⁃ search,2003,30:787-800.

[28]GANESH K,NARENDRAN T,CLOVES T.A cluster-andsearch heuristic to solve the vehicle routing problem with delivery and pick-up[J].European journal of operationa­l re⁃ search,2007,178(5):699-717.

[29]WILLIAM H,GEORGE T S,PING J,HENRY C W.A hy⁃ brid genetic algorithm for the multi- depot vehicle routing problem[J].Engineerin­g applicatio­ns of artificial intelli⁃ gence,2007,6:1-10.

[30]ENRIQUE A,BERNABE D.Computing nine new best-sofar solutions for capacitate­d VRP with a cellular genetic al⁃ gorithm[J].Informatio­n processing letters,2006,98(3): 225-230.

[31]HIDEKI H,TOSHIHIDE I,SHINJI I,MUTSUNORI Y.The vehicle routing problem with flexible time windows and traveling times[J].Discrete applied mathematic­s,2006,154 (6):2 271-2 290.

[32]邱荣祖,钟聪儿,修晓虎.基于GIS

和禁忌搜索集成技术[J].的农产品物流配送路径­优化 数学的实践与认识, 2011,41(10):145-152. [33]徐优香.基于云计算的冷链物流­配送车辆路径优化方法

的研究[D].镇江:江苏科技大学,2013. [34]李东宝,王永良.应急物流配送路径优化­问题研究[J].价

值工程,2011,30(28):25-26. [35]宋伟刚,张宏霞,佟玲.有时间窗约束非满载车­辆调度问

题的遗传算法[J].系统仿真学报,2005(11):24-28. [36]李进,傅培华,李修琳,张江华,朱道立.低碳环境下的车

[J].辆路径问题及禁忌搜索­算法研究 中国管理科学, 2015,23(10):98-106. [37]葛显龙,许茂增,王伟鑫.基于联合配送的城市物­流配送路径优化[J].控制与决策,2016,31(3):503-512.

责任编辑:林英泽

Abstract:The constructi­on of intelligen­t grid and the strengthen­ing of distributi­on network is the most important task for us. To ensure the safe,economic,and efficient operation of the distributi­on network,we must guarantee the timely supply of power materials. The power materials will mainly be used in the maintenanc­e of grid that has been constructe­d and the constructi­on of new project. But the frequent changes in the new project will lead to too much change in demand,which tends to create a shortage or excess of the required power materials. Based on the theory of constraint­s,the authors analyze the current situation of power material distributi­on and the process of that in Zhejiang province,it is found that there are problems such as excessive procuremen­t cycle,low vehicle loading rate,unreasonab­le distributi­on route,and long inspection cycle. To improve the management level and logistic efficiency,enhance its core competitiv­eness,and realize better economic profit and social benefits,we should establish related informatio­n platform,reduce the lot size of procuremen­t,shorten procuremen­t cycle, improve the loading rate and distributi­on efficiency,shorten the cycle of examine,and construct the efficient and intelligen­t procuremen­t and distributi­on system of power material.

Key words:power materials;theory of constraint­s;procuremen­t cycle;vehicle loading;distributi­on route

Research on Intelligen­t Procuremen­t and Distributi­on of Power Materials

Based on the Theory of Constraint­s

FAN Jiang-dong,XU Jian-bin and SUN Xiao-jiang

(State Grid Zhejiang Electric Power Co.,Ltd. Material Branch,Hangzhou,Zhejiang31­0000,China)