Architecture + Design

White but Vibrant

PUMP Nações, Lisbon NOZ Architectu­re, Lisbon

- Project: PUMP Nações, Lisbon Architects: NOZ Architectu­re, Lisbon

PUMP gyms fit into the ‘ smart cost’ category. The challenge was to create spaces with architectu­ral quality investing in design and modern feel, keeping constant the premise of finding more economic ways to do so. The original design/ concept was fully developed by the architects.

The gyms’ identity is strengthen­ed by the intuitive, functional and simple way of organizing the space layout. The new gym has two levels, the ground level, with a double height space, operates as the reception area in direct contact with the street and the upper level for most of the activity areas. The element of connection— the stairs— becomes the main actor of this space, revealing the young and daring identity and the dynamics of the activity of a gym.

GROUND FLOOR PLAN

FIRST FLOOR PLAN 1. ENTRANCE

2. RECEPTION

3. SHOP

4. BACK OFFICE

5. PERSONAL TRAINER STUDIO 6. BIKE BLAST STUDIO 7. BATHROOM

8. TOWEL COLLECTOR 9. SNACK BAR

10. SANITARY 1. VERTICAL CIRCULATIO­N 2. USED TOWEL COLLECTION 3. CIRCULATIO­N

4. SERVER ROOM

5. OPEN GYM SPACE 6. ADMINISTRA­TION

7. STUDIO

8. STORAGE

9. CHECK- UP ROOM

10. STAFF OFFICE

11. STORAGE/ WASHING/ CLEANING 12. MEN’S CHANGING ROOM

13. WOMEN’S CHANGING ROOM 14. MEETING ROOM

15. EMERGENCY EXIT

The colour palette used is neutral, to allow the calm needed to accommodat­e all the visual noise inherent in a gym’s equipment and users clothing. Strong colours are used only to highlight certain elements of the architectu­re or to stand- out certain furniture elements.

The reception desk is inspired by the movement and pace, through the mismatch of horizontal planes. Each piece is unique and the architects participat­e in its constructi­on in- situ defining the positionin­g of the various plans. The colour chosen is white, enhancing its formal appearance.

 ??  ??
 ??  ??
 ??  ?? Ines Sousa
Ines Sousa
 ??  ??
 ??  ?? SECTION
SECTION
 ??  ?? Factfile
Client: PUMP S. A.
Project Director: Inês Sousa
Consultant­s: EdX- Eng. Eduardo Cruz ( Structural, Plumbing);
Climobra ( Mechanical and Electrical); 1m ( Fire Safety)
Contractor: KBR
Built- up area: 1250sq m
Cost of project: 1M
Year of completion: 2013
Company names of products/ materials used: Locker Rooms – Huric; Lighting – Osvaldo Matos; Branding – Gravoplot – In9; Furniture – Huric, Ikea; Access Control – Arquivandu­s; Sound Instalatio­n – Sound Design/ António Bessa
Factfile Client: PUMP S. A. Project Director: Inês Sousa Consultant­s: EdX- Eng. Eduardo Cruz ( Structural, Plumbing); Climobra ( Mechanical and Electrical); 1m ( Fire Safety) Contractor: KBR Built- up area: 1250sq m Cost of project: 1M Year of completion: 2013 Company names of products/ materials used: Locker Rooms – Huric; Lighting – Osvaldo Matos; Branding – Gravoplot – In9; Furniture – Huric, Ikea; Access Control – Arquivandu­s; Sound Instalatio­n – Sound Design/ António Bessa