Planning is critical for hardware product start-ups and SMEs. By planning I mean the technical aspects of the product and the execution. In my experience, in case of most start-ups and SMEs, I have seen, planning has been rather transactio­nal, in the sense that they keep doing it as they go along—without a final end date as a goal. When a new product is planned there are three aspects which have to be nailed and should not be compromise­d. These are:

1. Costing of bill of material (BoM) for various volumes and supply chains for Class A (most critical and high cost) parts.

2. Manufactur­ing partner who will manufactur­e and the type of manufactur­ing needed. Typically, there are three types of manufactur­ing, start-ups and SMEs can follow:

(a) Get the PCBs soldered (no further processing) and components supplied by the product company. Normally this type is known as ‘Job Work.’

(b) From the supplied BoM assemble the PC boards, test, and deliver. This is normally known as ‘PCB Assembly.’ This step may involve testing of PCBs if the EMS vendor has ‘flying probe’ testers.

(c) Complete product manufactur­ing with start-ups providing only the documentat­ion. This type is known as ‘Box Build.’

3. Internatio­nal and national standards that the product/solutions should meet.

Most of the times, these three items are given low priority and addressed only in the last minute, which leads to utter chaos. I am not a votary of huge project planning, but if the essentials are not covered things are bound to fail. The above three issues, I have seen, come to haunt as the project progresses.

Why planning is critical?

When a customer buys a hardware based product, factors that are mainly looked at are cost, performanc­e, and support. I have

seen that start-ups and SMEs tend to focus more on technology.

Let me give an example from some Japanese product companies. Even high-end electronic­s products from Japanese vendors, if you look at their items like power supplies and other low-tech components, use older technologi­es like through-hole parts, paper phenolic PCBs, etc.

On the contrary, recently I reviewed a start-up’s PCB designed for a controller. The enclosure was big, but they had designed an extremely small PCB with small-footprint SMT (surface mount technology) parts. They were struggling with the design even after three revisions.

I stepped in because their investor asked me to review. I told them change to through-hole parts and use a simple two-layer board for the circuitry. They resisted citing SMT as the current technology. But their investor gave them no option, so they developed a ‘lowtech’ board reluctantl­y. As expected, the design worked. Their software team could get the very first version of the product working.

It is not ‘high-tech’ that matters, it is ‘appropriat­e tech’ that matters. Had they done their planning properly, it would have given them the cue to use a simpler technology and they need not have wasted time.

Most of the times when you develop a new product you have to get your product tested in the field before going for large-scale manufactur­ing. Most start-ups and SMEs assume the prototype can be quickly converted to a regular product, with little effort, which is a fallacy. Converting a prototype or an early-stage version to a manufactur­able product takes lots of effort, time, and money.

Designers need to understand that EMS vendors do not have engineerin­g teams to completely engineer the product for volume manufactur­ing. All this calls for good planning, without which a product will not be successful.

Some examples

A start-up had a novel design and developed the prototype with open source hardware components. As part of their pitching, they presented it to their prospectiv­e customers. One of them wanted a pilot trial for the product which used IoT hardware. The customer was willing to pay for the pilot as he saw value in the solution. But when the start-up tried building 50+ prototypes they could not as they had used parts which were not easily available at a regular price. My advice has been that for proving an idea for a few units’ testing, open source components are good but not for serious designs.

Then there was an SME who developed a probe for measuring battery voltage in a battery production line. Basically, in the manufactur­ing line a bunch of cells are connected together and charged. Voltages of the cells are normally measured manually, which was taking time. The battery manufactur­er wanted an automated solution. The SME designed a unit and made fifty prototypes. But when it was deployed, no probe was giving the 1mV accuracy the battery manufactur­er wanted. So, after a month the trial was stopped.

The battery vendor requested me to analyse what had gone wrong. (Their worry was whether there was any hidden issue in their manual measuremen­t process?) When I reviewed the design, I found the design was basically done for handcrafti­ng and was not suitable for largevolum­e production. Primary issues were: (a) there were no provisions in the design for periodic calibratio­n of the probes to meet the desired accuracy, and (b) it was not engineered for manufactur­ing. Had the team done detailed planning this project would have been successful.

What needs to be planned?

Planning for hardware products is done to ensure all the activities including design, manufactur­ing, certificat­ion, and field installati­on are covered and suitable actions are planned at the start of the project. Some of the critical items are:

1. Components for the final manufactur­ing and the sources to be identified. This ensures the lead times are within reasonable limits.

2. Selection of manufactur­ing partner, components vendors for parts like sheet metal, plastics, tooling, moulding, cable harness, and third-party hardware supporter if you want to deploy in larger geography.

3. Planning for product certificat­ion upfront and the agency who will do it. Planning at the end can create huge time and technical pressure.

4. Ensure the target price is under the radar and product design adheres to it.

Tips for planning

Let me give a few important tips for the start-ups and SMEs to keep the planning simple.

1. Complete the entire solution (hardware, software, cloud, etc) in one go; do not do the designing in bits and pieces.

2. Identify partners for EMS, tooling, packaging, etc early on, preferably during the design phase, and firm up the relationsh­ips.

3. Price and volume are interconne­cted. So be aware that initial low volumes will cost high. This essentiall­y means start-ups and SMEs have to call on what is the best price client is willing to pay. Typically, if your solution is going to save cost for the end customer, look at a subscripti­on based business model which allows you to recoup the cost of hardware and margins through subscripti­ons.

4. Understand the standards the product needs to comply with. With India integratin­g into the global market, local compliance standards are getting harmonised with the global standards. Designing a standards complying product costs money and effort. Plan that well early.

5. If you launch a new product, remember the software might have to be upgraded as the bugs are gradually getting fixed. True over-the-air (OTA) update will call for a controller with large memory and reliable link. This will make the product expensive initially. Plan for this too. In case cost does not allow an OTA-compliant hardware, devise a robust mechanism to provide upgrade for the software. This calls for good planning in the beginning itself.

 ??  ??
 ??  ??
 ??  ??
 ??  ?? S.A. Srinivasa Moorthy is director at D4X Technologi­es Private Limited