The Hindu (Erode)

‘Hogenakkal drinking water project meets daily supply requiremen­t’

-

Adequate water ful‹lling the daily supply requiremen­t earmarked under the Hogenakkal project is being released despite low inŽow in the Cauvery, Collector K. Shanthi has said.

Addressing reports of severe drought in Hogenakkal due to non-release of water in the Cauvery by Karnataka, the district administra­tion has said it has not a ected the drinking water supply.

According to the Collector, despite Hogenakkal seemingly barren with the low water level and exposed rocks, water is still being pumped from the Master Balancing Reservoir, 11 kms from Hogenakkal, to ful‹l the daily requiremen­t to the project areas in Dharmapuri and Krishnagir­i.

Hogenakkal drinking water project supplies water to Hosur Corporatio­n, Dharmapuri and Krishnagir­i municipali­ties, 16 town panchayats, and 20 panchayat unions and 6,758 households in those unions.

Sand bags

As a precaution­ary measures, sand bags were packaged in March to supply uninterrup­ted water for the project in the project’s reservoir. As a result, 144 MLD of water is being supplied surpassing the daily requiremen­t of 130.40 MLD.

According to the Collector, the water inŽow in the Cauvery in Biligudulu reservoir was 130 cub.ft. In the event of water level dropping below 100, additional e orts will be made by desilting and packaging the waterway with more sand bags to ensure supply of water for the project, the administra­tion has stated.

Newspapers in English

Newspapers from India