Vayu Aerospace and Defence

GE9X certificat­ion testing

-

Trials of the first full engine to test (FETT) GE9X engine commenced in March 2016 at Ohio, generating critical data on the full engine system and aerodynami­c performanc­e, mechanical verificati­on, and aero thermal system validation. Testing of the

FETT engine concluded earlier this year with a series of preliminar­y natural-icing tests at PTO, where the GE9X ran more than 50 test points, accumulati­ng 168 hours and 162 cycles for certificat­ion testing. The GE9X will power Boeing’s new 777X aircraft.

 ??  ??

Newspapers in English

Newspapers from India