Vayu Aerospace and Defence

MoD orders 118 MBT Arjun Mk-1A’s for Indian Army

-

India’s Ministry of Defence ( MoD) placed an order with Heavy Vehicles Factory ( HVF), Avadi, Chennai for supply of 118 Main Battle Tanks (MBTs) Arjun Mk- 1A for the Indian Army on 23 September 2021. The order, worth Rs 7,523 crore, will provide further boost to the ‘Make in India’ initiative in defence sector and is a big step towards achieving ‘Aatmanirbh­ar Bharat’, envisioned by Prime Minister Mr. Narendra Modi. It may be recalled that the Prime Minister had handed over the MBT Arjun Mk-1A to Chief of Army Staff General M M Naravane in Chennai on 14 February 2021.

The state– of- the- art MBT Mk- 1A is a new variant of Arjun Tank designed to enhance fire power, mobility and survivabil­ity. Infused with 72 new features and more indigenous content from the Mk-1 variant, the tank will ensure effortless mobility in all terrains, besides precise target engagement during day and night. It has been designed and developed by Defence Research & Developmen­t Organisati­on ( DRDO) by incorporat­ing numerous upgrades on Arjun MBT, the in-service main battle tank with the Indian Army.

The MK-1A is equipped with accurate and superior firepower, all-terrain mobility and an invincible multi-layered protection provided by an array of advanced technology systems. It can take on the enemy during day and night conditions and in both static and dynamic modes. By virtue of these capabiliti­es, “this indigenous MBT proves to be at par with any contempora­ry in its class across the globe”. This tank is particular­ly configured and designed for Indian conditions and hence it is suitable for deployment to protect the frontiers in an effective manner.

This production order to HVF, Avadi opens up a large avenue in defence manufactur­ing for over 200 Indian vendors including MSMEs, with employment opportunit­ies to around 8,000 people. This will be a flagship project showcasing the indigenous capability in cutting edge defence technologi­es.

The MBT Arjun Mk- 1A has been designed and developed by Combat Vehicles Research and Developmen­t Establishm­ent (CVRDE), along with other laboratori­es of DRDO within two years ( 2010- 12). The developmen­t activities commenced from June 2010 and the tank was fielded for user trials in June 2012. It took only two years to develop and field the MBT Arjun Mk-1A for user trials from the user requiremen­t. Extensive trial evaluation was conducted in various phases covering 7000+ kms ( both in DRDO and user trials) of automotive and substantia­l firing of various types of ammunition during 2012-2015.

 ?? ??
 ?? ??

Newspapers in English

Newspapers from India