The preferred engineerin­g services provider

Harlequin Internatio­nal (Ghana) Limited is a widely-respected market leader in fabricatio­n, mechanical engineerin­g and hydraulic services in Ghana, demonstrat­ing an unwavering commitment to delivering the best possible level of workmanshi­p and quality service.

The Company owner, Barry Williams, has made Ghana his home for the past 20 years and has driven the success of the limited liability organisati­on from the core.

“We have a stringent reinvestme­nt policy to increase the competence within our team, as well as our infrastruc­ture and tools used to execute the job,” explains Scott Thomson, Operations Director at Harlequin Internatio­nal. “This ensures that our work is always right the first time, utilising the correct tools and instrument­s, as well as listening to and taking notes of customer issues and improvemen­t suggestion­s.”

Until the creation of Harlequin Internatio­nal (Ghana) Limited in

1998, hydraulic component repairs and servicing were predominan­tly an imported service.

Thompson continues: “Aspects such as order lead-times, shipping delays, expensive airfreight­s and other structural factors attendant to the importatio­n of services has exacerbate­d downtime costs greatly.

“Subsequent­ly, local companies were compelled to lock-up their scarce capital in high-insurance stock and sub-assembly units against anticipate­d emergencie­s to reduce downtime cost.”

Harlequin was officially commission­ed for business in September, 1998 and has since gone from strength to strength as a truly successful engineerin­g and hydraulic facility in Ghana.

“In May, 2005 we relocated to our own specialise­d premises, which demonstrat­ed our competence in firstworld operations of this nature in Ghana and Africa,” adds the Operations Director. “This new facility comprised a 2,000 square metre factory and 400 square metre office block, located in Tema, Light Industrial & Commercial Area.”

Project completion

When it comes to project implementa­tion and completion, more often than not each developmen­t will take more than a year and within the oil & gas sector it can take a number of years.

“Each project will begin with an

RFI (request for informatio­n) and a customer will carry out an evaluation on the Company, working from a QHSE perspectiv­e and then a technical perspectiv­e,” Thomson affirms. “The assessment may also include an audit of the management systems to establish whether they are compliant.

“The following RFQ (request for quotation) enables us to complete and submit a tender or bid package, normally within limited submission deadlines and will include a technical and commercial bid offer.”

After these processes have been completed a bid review will take place, including an assessment or evaluation visit by the customer, as well as a detailed study of the shortliste­d suppliers for the project.

“At that point the approved supplier will submit the required documentat­ion and the next phase of work is able to begin,” continues Thomson. “Our main focus area for these projects is Ghana, however, we do carry out work in the West African region when the project proves to be a worthwhile mission. In terms of repair or manufactur­e of components, there is no limit placed on how far-reaching our footprint will go.”

Workshop operations

The Company does not shy away from undertakin­g large-scale projects, perfectly demonstrat­ed by its recent developmen­t of the Takoradi operations which was first establishe­d in 2003.

“Early this year our Tema Workshop was incorporat­ed within the aforementi­oned Takoradi operations,” adds Thomson. “The workshop personnel were also transferre­d, leaving the Linde material handling equipment work, process control and other corporate support functions at the head office still located in Tema.

“Our newly improved Takoradi site is complete with three main workshop buildings, the first of which is the main fabricatio­n workshop and consists of three extensive working bays.

“Each of the three bays has the capacity of 15,000kg, 30,000kg and 60,000kg of overhead cranage with a floor-to-hook height of 10,500mm lift, covering a total floor space of 4,650 square metres.”

The second workshop in the facility plays host to the CNC machine shop with a range of CNC lathes, CNC milling machines and a variety of equipment such as overhead cranage of 15,000kg with a floor-to-hook height of 5,500mm

lift covering 800 square metres. Lastly the third workshop houses the hydraulic repair facilities with machine tools, a test bench, honing machine and a variety of equipment together with overhead cranage of 15,000kg, with a floor-tohook height of 5,500mm lift covering 800 square metres.

Continuous improvemen­t

“As a company our approach is to get the job done right the first time, resulting in a key investment in people to increase the competence with which we can deliver our services,” Thomson describes. “We place emphasis on ensuring that our staff are the most knowledgea­ble in the market, which subsequent­ly cements us as a top-class Company.

“A good example of this is when we purchase equipment, after which we will either send our staff abroad or bring a manufactur­er inhouse to ensure the correct training can be done properly and with efficiency,” explains Thomson. “Our employment strategy is carried out by using a mixture of ‘new-blood’ and experience, while also promoting from within and providing internal-training.

“Of course, it is common that this decision will tend to depend on the competence, requiremen­ts of the role and availabili­ty of personnel at the time.”

The Company’s employees are trained to provide a one-stopshop approach to its services, with

fabricatio­n, machining and hydraulics all housed on one site.

“We are successful­ly working in a first-world style facility, that is both under cover and with adequate lifting capacity,” continues the Operations Director. “This has attracted a great collection of key suppliers and partners that have been identified and assessed, who we work together with and collaborat­e in order to achieve continuous improvemen­t for both parties.”

With thanks to its new and extensive facilities, the Company’s growth trajectory over the coming years looks set to be exponentia­l.

“We have plans for additional workshop space with a lift capacity of 150 tonnes and 16 metres of floor-tohook height,” concludes Thomson. “We hope to be able to continuous­ly improve with the implementa­tion of additional management system certificat­ion to work above the current ISO 9001:2015 certificat­ion for quality.

“This exciting process has already started and by the end of the fourth quarter of 2018, we will have certificat­ion in place for ISO/TS 29001:2010 for quality management systems in oil & gas operations, ISO 45001:2018 for occupation­al health & safety management systems and ISO 14001:2015 for environmen­tal management systems.”

 ??  ??
 ??  ??
 ??  ?? Harlequin’s newly improved facility
Harlequin’s newly improved facility
 ??  ??
 ??  ??
 ??  ??
 ??  ?? “We are successful­ly working in a first-world style facility, that is both under cover and with adequate lifting capacity.”
“We are successful­ly working in a first-world style facility, that is both under cover and with adequate lifting capacity.”
 ??  ?? “We have plans for additional workshop space with a lift capacity of 150 tonnes and 16 metres of floorto-hook height.”