The Borneo Post (Sabah)

Two bids received for Phase One of Sarawak Metro’s KUTS Package 1

-

KUCHING: Sarawak Metro Sdn Bhd (Sarawak Metro) has received two bids for the Kuching Urban Transporta­tion System (KUTS) Project’s System Package 1 tender.

The tender for Phase One of the KUTS Project’s System Package 1 is for the supply of rolling stock (hydrogenpo­wered Autonomous Rapid Transit (ART) vehicles), depot equipment and maintenanc­e vehicles (DEMV), signalling and control system (S&CS) and automatic platform gate (APG).

One of the bids is from the joint venture company of CRRC (Hong Kong) Co Limited,

CHEC Constructi­on (M) Sdn Bhd and KACC Constructi­on Sdn Bhd.

The other bid is from the joint venture company of EPR (Kuching) Sdn Bhd, Global Rail Sdn Bhd and Mobilus Sdn Bhd.

As a requiremen­t of the tender exercise, each joint venture has to consist of a local Sarawak partner.

The local Sarawak companies in the joint-ventures involved in this tender are KACC Constructi­on Sdn Bhd and EPR (Kuching) Sdn Bhd.

A third joint venture company, which earlier expressed their interest to take part in the tender, however, did not submit a bid by the closing date on March 31.

The contract to the successful bidder is expected to be awarded by the second quarter of this year.

Sarawak Metro, a whollyowne­d subsidiary of Sarawak Economic Developmen­t Corporatio­n (SEDC), advertised in both internatio­nal and national publicatio­ns in mid2021, calling for companies to register as rolling stock vendor.

Meanwhile, Sarawak Metro will call for tenders for System Package 2 of the KUTS Project (Phase One) by the second quarter of 2022.

This package comprises communicat­ion system (COMMS), automatic fare collection (AFC), informatio­n technology system (ITS), supervisor­y control and data acquisitio­n (SCADA), computeris­ed maintenanc­e management system (CMMS) and operation control centre (OCC).

The developmen­t of the KUTS project will be conducted in phases; Phase One will involve the developmen­t of two lines, namely the Samarahan Line, which covers a distance of about 28km from Rembus to the city centre, and the Serian Line (24km) from 12th Mile KuchingSer­ian Expressway to the Isthmus.

The passenger service for the ART will be introduced in stages, starting from the fourth quarter of 2025.

Newspapers in English

Newspapers from Malaysia