East Stand revealed
Yarrow Stadium's new East Stand has been revealed with the release of artist's impressions of the design. The stand has a flexible ‘double sided' design meaning it can be used by those watching the main pitch or the sports field behind it and is fully accessible to those with mobility issues.
There are three spaces in the hospitality area, the kitchens can be opened for weekend sports as well as large-scale events and there are a mix of toilets including gender neutral facilities to cut down on waiting times. Construction of the stand starts this year and is scheduled to be completed by 2024.