An eas­ier ride back

The Northland Age - - Local News -

The Wai­tangi Moun­tain Bike Park now has a ded­i­cated shut­tle van to give riders a lift back to the top of the park af­ter their down­hill run.

The shut­tle is aimed at those who en­joy ex­plor­ing the tracks but find the climbs a chal­lenge, as much as those who want to hone their down­hills with­out los­ing time rid­ing back to the top.

From the top the park of­fers a range of tracks from easy and begin­ner grades to in­ter­me­di­ate and ad­vanced, each shut­tle loop tak­ing 15-20 min­utes.

The shut­tle runs most week­ends, most school hol­i­days and spe­cific days over sum­mer (go to www.face­book.com/pai­hi­amtb­shut­tles or pai­hi­amoun­tain­bikes.co.nz/wai­tangi-moun­tain-bikepark-shut­tle-ser­vice for the sched­ule).

Share­able tick­ets, valid for one year, can be bought on the Pai­hia MTB web­site or from the driver with cash.

Newspapers in English

Newspapers from New Zealand

© PressReader. All rights reserved.