Benidorm roadworks
The first phase of major works on the Avenida Mediterraneo in Benidorm have begun, starting with the replacement of the hydraulic infrastructure that deals with all things water – sewage, drinking water and rainwater, located by the Plaza de la Hispanidad. This phase of works, which are the most complex as the water table is particularly low at this point but should be completed in time for Easter. During this stage some roads have been cut off to traffic and buses have been diverted.