Daily Sabah (Turkey)

Istanbul to get 2 new subway lines

-

TURKEY’S biggest metropolis Istanbul is getting two new subway lines, totaling 12.9 kilometers (8 miles), the transport and infrastruc­ture minister announced yesterday.

The first will be establishe­d in the Üsküdar district on the city’s Asian side and will span between the neighborho­ods of Altunizade and Çamlıca, Adil Karaismail­oğlu told a ceremony in Istanbul.

The Altunizade-Ferah-Çamlıca will be a 4.5-kilometer subway system project.

Üsküdar is home to Turkey’s first fully automated subway system. The ÜsküdarÇek­meköy line is 20 kilometers long and has 16 stops.

The district is also included in the Marmaray, an underwater rail system beneath the Bosporus connecting the Asian and European sides of Istanbul.

Estimated to be approximat­ely 8.4 kilometers long, the other line will connect the

Kazlıçeşme and Sirkeci neighborho­ods on the European side, Karaismail­oğlu said.

The total length of lines in Istanbul is currently 251 kilometers. It will eventually reach 342 kilometers once the ongoing projects are completed, the minister noted. Half of the length will have been commission­ed by the ministry, he added.

Works are currently ongoing on six lines, the minister said, including the PendikTavş­antepe-Sabiha Gökçen Airport line on the Asian side, and the Bakırköy-Kirazlı, Başakşehir-Kayaşehir, Gayrettepe-Istanbul Airport and Halkalı-Istanbul Airport lines on the European side of the city.

The high-speed metro line connecting the heart of Turkey’s metropolis to the mega Istanbul Airport is scheduled to be completed by end of this year, Karaismail­oğlu said.

The line will whisk passengers from Gayrettepe, in Şişli on Istanbul’s European side, to the airport in just 35 minutes.

The subway will stretch 37.5 kilometers, include nine stations and will be the country’s fastest metro line, operating at a speed of 120 kph (75 mph).

The 31.5-kilometer Halkalı-Istanbul Airport line is expected to be completed by the end of 2022, the minister noted.

The Istanbul Metropolit­an Municipali­ty (İBB) last month also said new subway lines would be commission­ed in the coming years.

One of the lines will reportedly start from the Beylikdüzü district on the European side of the city and end on the Anatolian side’s Pendik district, covering a total distance of 72 kilometers.

The subway is expected to reduce the time length between the two locations to an hour.

Named HIZRAY, of which the tender bid is expected to take place in 2021, the line will reach a speed of up to 80 kph.

 ?? EDITOR ALEN LEPAN ?? Employees work on the Halkalı-Istanbul Airport metro line, Istanbul, Turkey, March 1, 2021.
EDITOR ALEN LEPAN Employees work on the Halkalı-Istanbul Airport metro line, Istanbul, Turkey, March 1, 2021.

Newspapers in English

Newspapers from Türkiye