MCA was recently awarded a contract with ECG for the LV Equipment for the new Sandrado Gold Plant located in Burkino Faso.
The project included the supply of all the low voltage control centres and mobile substations. This mine will be supplied with five of MCA’s Sivacon S8 Low Voltage MCC’s installed within containerised substations.
These substations will be complete with VESDA fire protection systems, Aircons and pressurisation units, Schneider
APC UPS’s, and all small power and lighting equipment. These units will be pre-commissioned and tested in Johannesburg in July and shipped to site in August 2019, ready to run.