PROJECT MILESTONES

-

The first few weeks were all about the groundwork­s and foundation­s. By the end of November 2018, the concrete raft foundation was poured by ICF Contractor­s, ready for the basement walls to commence By January 2019 we had a full basement, complete with a twopart waterproof­ing system. This image shows the installati­on of the cavity drainage membrane, which allows any water that penetrates into the building to be directed away via drainage channels and a sump pump Come February, Hadfield Concrete Structures were on site pouring the ground floor walls. This process takes just a day: what sucks up most time is elements such as getting the structural openings right (essential as we’ve already ordered our windows) and bracing and aligning the ICF blocks

By mid-march our first floor external walls were braced and poured, with an external scaffold in place for health and safety. The first floor structure – in our case consisting of steel beams and posijoists – had to be installed before the walls were built up

 ??  ??
 ??  ??
 ??  ??
 ??  ??

Newspapers in English

Newspapers from United Kingdom