Build It

Introducin­g a live renovation

Build It expert, Alan Tierney, talks us through his refurb of a grade II* listed property in Devon

-

Alan Tierney embarks on his own ambitious refurb project

As many Build It readers will know, I’ve worked as a historic building consultant for the past 15 years. In that period, I have advised many clients on how to repair and renovate old properties. I’ve now decided the time has come to put my money where my mouth is and take on a restoratio­n project of my own!

I’ve purchased a grade II* listed house in Devon, which needs a complete overhaul. Though it’s generally in good structural condition, most of the dwelling has no electricit­y, heating or plumbing. Like many old buildings, it was subject to various alteration­s in the 20th century, using materials incompatib­le with its traditiona­l constructi­on. Plus, the quality of some of that work leaves a lot to be desired.

This is a long-term project that’ll take years to complete. As it progresses, I’ll be writing a blog for Build It, which you can read online at www.self-build.co.uk/alan-blog. I look forward to having you with me on the journey.

The house’s history

The building is constructe­d of stone on the ground floor and cob on the first storey, with a thatched roof covering. This is typical for this part of Devon. In fact, all the materials are very local – the clay for the cob and some of the stone were even dug from the site itself.

The property’s developmen­t is quite complex and is not easy to date accurately, but it was clearly constructe­d one section at a time over several hundred years. The oldest part is the eastern portion of the main structure, dating from the mid 16th century. This accommodat­es a dining room and bedroom. It is nearest to the centre of the village and adjoins older houses in a terrace. We’re not sure what happened next, but the rest of the main structure was built some time during the 17th and 18th centuries. Work likely took place in two phases, with a massive chimney stack and staircases incorporat­ed. In the 19th century a rear wing was added to house a kitchen and a bedroom.

In the 1970s or 80s a single storey extension was added to the back of the property, establishi­ng a garden room and store. This is in appalling condition and will have to be replaced. Finally, in the 1990s some outbuildin­gs attached to the 19th century wing were converted into an independen­t annexe. The quality of constructi­on and the dated design leaves a lot to be desired and will need considerab­le alteration in due course. For now, though, it provides very comfortabl­e accommodat­ion while we carry out the work on the main structure. It’s a major bonus – I refer to it as the world’s most comfortabl­e site caravan.

Assessing the condition

The older parts of the house are in a good state of repair including, thankfully, the thatch. This is despite extensive incorporat­ion of inappropri­ate, cement-based materials such as solid concrete floors, cementitio­us plaster and Artex to the ground floor. Sand and cement render has been applied externally to the first storey cob and cement pointing to the stonework on ground level. These are interferin­g with the ability of the historic fabric to dry out, making the house cold and uncomforta­ble. We’re lucky it has endured these interventi­ons relatively unscathed.

Its survival is due to a combinatio­n of factors. Firstly, we are on top of a hill, so the site is well drained – even in rainy

Devon. The large overhang from the thatched roof protects the first-floor render from the elements, too. The stone walls of the ground floor, up to 800mm thick, are very resilient. Though they are damp in places, they show few signs of deteriorat­ion.

Poor quality metal windows were fitted in the 80s and are very draughty. They’re unsightly and have bad thermal performanc­e – but do, at least, mean the home has been well ventilated. Plus, the main dwelling has been largely empty for much of the past 20-25 years, without any central heating. As a result, the amount of water vapour that has been generated internally is much lower than it would be in an occupied building.

The annexe is poorly designed and constructe­d. While the stone walls surviving from the earlier outbuildin­gs are in good condition, poor quality timber in windows, doors, etc has deteriorat­ed and the new blockwork gable wall is showing signs of structural failure.

The single-storey garden room extension is a disaster area. The roof leaks in numerous places, the walls are severely damp, window frames are rotten, roof timbers are decayed – the list goes on. It’s a sadly common and rather chastening experience to see a modern part of the building at the point of total failure within 40 years of constructi­on, while the adjoining part is still going strong after 450 years, despite everything that’s been thrown at it.

Our renovation objectives

We have three clear goals for the project. Firstly, to conserve this important historic building – only about 5% of listed buildings have grade II* status. Secondly, we’d like to create a comfortabl­e, attractive and healthy home for the long-term. We are also keen to maximise sustainabi­lity throughout the scheme, both in terms of execution and how the property operates in the future.

Fortunatel­y, these aims are compatible with one another and have considerab­le overlap. The best materials for use in traditiona­l buildings are natural ones. These generally come with good sustainabi­lity credential­s and are ideal for creating comfortabl­e, healthy living environmen­ts. The decisions we take throughout the scheme will need to satisfy all three aims. We’re in the process of compiling a team to work on the project, and their commitment to this philosophy will be an essential qualificat­ion.

Our plans for the internal plasterwor­k, for instance, illustrate this approach. Clay plaster is a historical­ly appropriat­e material for this kind of structure. It is highly vapour permeable and has functional physical properties that are extremely beneficial to traditiona­l building fabric. Those characteri­stics include the ability to buffer moisture and temperatur­e, establishi­ng a healthy living environmen­t. The soft finish and flowing lines of this solution enhance the character of an old dwelling, too, and create an attractive aesthetic for modern living.

We are fortunate to have a paddock from which we will dig the clay to make plaster, eliminatin­g any environmen­tal cost from manufactur­e or transporta­tion. The excavation of the raw material will serve a dual purpose, forming trenches for the installati­on of a ground source heat pump (GSHP). Clay plaster is also durable, infinitely reusable and recyclable, so is sustainabl­y future proof.

Renovating in stages

The first phase of the project will be to strip back the modern finishes and remove the solid concrete floors, to be replaced with lime surfaces bedded on foamed glass aggregate. When the building is uncovered we will be able to carry out first fix electrics and plumbing, including pipework for underfloor heating. Alongside this will be the design process for windows, doors and a staircase, as well as the replacemen­t of the garden room with a glazed, light-filled atrium. We will also reconfigur­e the annexe. These alteration­s will require a series of listed building consent applicatio­ns – the first of which has already been submitted for considerat­ion.

During the summers we will do the external work, which includes raking out the cement pointing and redoing it with lime. We will also add a new ridge to the thatch and carry out some minor repairs, excavate the clay for the GSHP and strip the cement render, ready for its lime replacemen­t.

Once the new windows have been fitted and the lime floors have cured, we will replaster and repair the surviving historic plaster finishes, most of which are upstairs. Some of the modern partitions and subdivisio­ns will also be reconfigur­ed. At this point, we will carry out joinery repairs and install the new staircase, too.

Of course, that’s just for starters. There’s lots to do, so there needs to be a balance between what I can realistica­lly do myself, using my existing skills and developing some new ones, and what it’s more sensible to engage other skilled profession­als for. Follow our project online at www.self-build.co.uk/alan-blog to see how we get on.

 ??  ?? Above: The oldest part of the house dates back to the mid 16th century. The thatch roof is in good condition, though some minor repairs will be carried out. Below: The annexe will provide a decent space to stay while works go on in the rest of the house
Above: The oldest part of the house dates back to the mid 16th century. The thatch roof is in good condition, though some minor repairs will be carried out. Below: The annexe will provide a decent space to stay while works go on in the rest of the house
 ??  ??
 ??  ?? The house has been added to many times over the years, resulting in a quirky layout of rooms
The house has been added to many times over the years, resulting in a quirky layout of rooms

Newspapers in English

Newspapers from United Kingdom