How to do it 1 2
Define the area of the patio with string a ached to pegs – use an engineer’s square to check corners. Dig out to a depth of 15cm (6in) and level the bo om. Arrange around the inside edge support materials until set.
Tip in crushed stone, rake and tamp down to leave