TAKING SHAPE
How the cathedral has evolved over the last century
1889
After the crypt was completed, the apse was built. This is the area of a church where the altar is located.
1930
The bell towers were built between 1894 and 1930. This was the last part Gaudi saw built during his lifetime.
1954
Work on the Passion façade began. Gaudi used bone shapes to display the fear and cruelty of Jesus’ death.
1978
Work started on the walls of the naves – the central rooms. There is one central nave with three entrances leading to it.
2020
Just eight per cent of the Glory façade had been completed pre-covid. This began development in 2002.
2026
Upon completion, the central tower of Jesus will be the tallest point, built to a height of 172 metres.