THE BUILD IN PICTURES
Blockwork walls were erected – here the front door opening and inner and outer skin walls are visible.
A view of the inside face of the external wall inner leaf which creates the airtightness for the walls.
Partition walls being erected to divide up the zones in the ground floor space. The large opening is for the stairwell.