Oakham footbridge revamp
MARCH 31 saw the station footbridge at Oakham in Rutland reopen following an £856,000 upgrade.
The bridge had been closed since October 2020, during which time it was stripped back to bare metal, strengthened, repaired and repainted. A new parapet and non-slip floor have also been installed.