Towpath Talk

Milestone moment for restoratio­n project

-

IT WAS a big moment at the Wey & Arun Canal Trust’s latest major restoratio­n project as the footbridge for the road crossing at Tickner’s Heath in Alfold, Surrey, was put into place.

The 6.5-tonne steel frame was carefully lifted in by a 100-tonne crane, ready to be attached by FourTees Engineers from Fareham, who created the 16m specialist structure.

It is part of a project that will also see the constructi­on of a new road bridge and excavation of the canal at the summit.

The original arch bridge across the canal has long been demolished and the road realigned on to an earth causeway which blocks the route of the canal, so the Wey & Arun Canal Trust intends to create a new road crossing and canal cut to rejoin the original canal to the west of the old crossing.

As the road over the new bridge will be no wider than the existing road, the separate footbridge will be used by pedestrian­s, cyclists and horse riders.

Work on the project began last autumn and since then volunteers have created culverts, a constructi­on compound and the concrete bankseats on which the footbridge sits, as well as the brick facing for the footbridge abutments.

Their next task is to install the oak timber deck and handrails.

Project manager Tony Ford said volunteers and Wey & Arun Canal Trust employees had accomplish­ed a lot in difficult circumstan­ces.

He explained: “Volunteers have really shown their commitment to this project, given constructi­on has been stop-start thanks to the several lockdowns we have experience­d over the past year. Small teams have worked incredibly hard to ensure we have reached this point in the build and that we can press on to the next stage.

“We now look forward to constructi­ng a short temporary diversion for Dunsfold Road to take traffic away from the site of the new canal crossing.

“Following that a water main needs diverting by Thames Water and we can then finally get on to build the new road bridge.”

 ??  ?? The frame for the new bridge is lifted by a 100-tonne crane.
The frame for the new bridge is lifted by a 100-tonne crane.
 ?? PHOTOS: JULIAN MORGAN/GILL DAVIES/JULIAN NOWELL ?? The new bridge takes shape.
PHOTOS: JULIAN MORGAN/GILL DAVIES/JULIAN NOWELL The new bridge takes shape.

Newspapers in English

Newspapers from United Kingdom