Yorkshire Post

Moss plan to cut flood risk from moorland

- Charles Brown NEWS CORRESPOND­ENT

HUNDREDS of thousands of sphagnum moss “speed bumps” are being planted to restore peatland and slow the flow of water on Kinder Scout, the National Trust has said.

The charity is restoring 526 hectares (1,300 acres) of peatland on Kinder Scout, a moorland that forms the highest point in Derbyshire and is famous for the mass trespass of 1932, which led to the creation of the country’s national parks.

Around 130,000 sphagnum moss plugs have been planted in the first phase of the project which will see 800,000 put into the landscape to create healthier blanket bog, and slow the flow of rainwater across the land.

The National Trust, which looks after Kinder Scout, said that once the sphagnum moss plugs have establishe­d, they will act as tiny “speed bumps” for rainwater falling on the moors.

Instead of running down in a straight line, the water will be forced to weave its way slowly down the moorland slopes, helping to alleviate flooding in nearby local towns and villages including Glossop, Whaley Bridge and Edale.

The moss, which can hold up to 20 times its own weight in water, will also help create the right conditions for peat to actively form, allowing the site to lock up carbon more effectivel­y.

It will provide sufficient­ly wet conditions to allow a mix of moorland plants such as heather, bilberry and cotton grass to grow, and create habitat to support wildlife such as dragonflie­s, golden plover, frogs and lizards, the trust said.

The restoratio­n builds on previous work and a study carried out by the Moors for the Future partnershi­p and the University of Manchester using data from an outdoor laboratory on Kinder Scout.

The study found that once sphagnum moss has grown, water takes more than two hours longer to make its way off the moors compared to bare peat.

This is because it creates a rougher, more textured surface which slows the flow of water and delays rainwater arriving in streams and rivers all at the same time from the same direction, the charity said.

Craig Best, general manager for the National Trust in the Peak District, said it was “absolutely critical” that the work to restore the peatland happened now.

“This year alone, we’ve seen dramatic weather events seriously affect thousands of households across the Midlands and beyond,” he said.

“As we’re faced with the likelihood of more significan­t bouts of extreme rainfall, it is stark reminder that we need urgent action to increase our resilience in a changing climate.

“In good condition, the moorlands of the Peak District can offer part of the solution to reduce carbon emissions and reduce the risk of flooding for people living downstream, so it’s vital that we continue to do as much restoratio­n as quickly as we can.”

Work has now paused to prevent disrupting the area’s ground nesting birds during the breeding season.

It will resume in August, with more planting, as well as building dams in gullies and the distributi­on of heather brash – or cut heather – seed, lime and fertiliser, to help moorland plants to grow.

Newspapers in English

Newspapers from United Kingdom