Albuquerque Journal

Keeping the lights on

PNM’s power operations center shows complexiti­es of grid reliabilit­y

- BY KEVIN ROBINSON-AVILA JOURNAL STAFF WRITER

Editor’s note: The Journal starts a two-part series on Senate Bill 165, the Local Choice Energy Act, which was introduced in the Legislatur­e earlier this session.

The control room at Public Service Company of New Mexico’s power operations center in Albuquerqu­e’s South Valley conjures images of a NASA command control center.

Massive, full-wall screens with live, real-time displays of New Mexico’s entire electric grid dominate the room, offering system operators a bird’s eye view of all transmissi­on lines throughout the state. Specially trained and licensed technical staff monitor the screens in 12-hour shifts for immediate response to any issue that arises on the grid, such as a sudden rise or fall in voltage on a transmissi­on line caused by, say, a spike in consumer electric demand, a fault in some power generation plant or a raccoon that’s messed with the wiring somewhere on the system.

Control-room computers monitor everything in real time, instantane­ously reporting and pinpointin­g a problem for operators to take action, said Kelsey Martinez, the center’s manager of regional transmissi­on organizati­on and markets.

“We’re talking fractions of a second to immediatel­y balance the load at all times,” Martinez told the Journal during a tour last week. “We’re here 24/7, 365 days a year. No one can leave until someone shows up to take their place.”

The tour offered a unique inside look at what could be considered the heart and soul of PNM operations to keep the lights on around the clock. It’s the first such media visit offered in at least a decade by PNM, which invited the Journal to demonstrat­e the complexiti­es of coordinati­ng power generation and distributi­on without interrupti­on as the state and nation’s electric grid undergo a revolution­ary transforma­tion to replace fossil-fuel generation with renewable

energy like solar and wind.

It’s no coincidenc­e that the tour coincides with a new effort in the New Mexico Legislatur­e to allow local government­s and tribes to take control of local electric generation in their communitie­s away from PNM and the state’s two other private utilities, El Paso Electric and Southweste­rn Public Service. Supporters of the initiative, Senate Bill 165, want to empower local government­s to set up “local choice energy” utilities, or LCEs, to independen­tly speed the adoption of renewable energy in their communitie­s faster than the privately run utilities are now.

But opponents say that could create grid reliabilit­y issues, complicati­ng centralize­d efforts to make sure electricit­y flows where and when it’s needed at all times. That’s because nearly all independen­t utilities supplying electricit­y in New Mexico transmit power over PNM’s grid, which the company coordinate­s through its operations center.

As more intermitte­nt renewables like solar and wind come online, central power coordinati­on becomes more critical to dispatch backup energy in an instant when the sun doesn’t shine or the wind doesn’t blow. And climate change is creating more challenges, such as extreme summer heat that spikes consumer demand for electricit­y to run air conditione­rs.

“Having a wide-area view — seeing the big picture — when we make instantane­ous decisions about what resources to draw on and where to put them is critical,” Martinez said. “LCEs may have noble ideals and end goals to increase renewable generation. But they’re only looking at a small region — just a piece of the big puzzle — without the global view to coordinate grid reliabilit­y, which can complicate our power-balancing operations.”

Regional coordinati­on

PNM’s power operations center has functioned since the 1980s to manage state-level electricit­y flow. But in 2021, it joined the Western Energy Imbalance Market, or EIM, which coordinate­s power flow among eight states to help balance out the ups and downs of electric supply on a regional basis as more renewable generation replaces fossil-fuel plants throughout the West.

PNM manages participat­ion in the EIM for New Mexico. It’s now working with the other EIM members to combine their state systems into a fully integrated Regional Transmissi­on Organizati­on. That would allow them to go beyond today’s instantane­ous decision-making on power flow among states to instead jointly plan ahead to balance regional electricit­y supply and demand.

EIM members hope to begin day-ahead planning by 2024, and, eventually, expand to months or years ahead as renewables are massively added to the grid.

LCE challenges

Local choice energy supporters say they can procure cheap and reliable renewable generation from third-party providers, or by building their own facilities, such as solar plants with backup battery storage. In the process, they can create self-sustaining microgrids to independen­tly provide power when access to third-party energy supply is unavailabl­e, such as during severe weather events, said Alysha Shaw, campaign director for Public Power New Mexico, which is promoting SB 165.

“There has never been a brownout or a blackout linked to a local choice provider in any state where this policy is law,” Shaw told the Journal. “Local choice providers offer safe and reliable electricit­y that is affordable and renewable.”

In any case, PNM and other New Mexico utilities would be providers of last resort in an emergency.

“The utilities in our state already provide distributi­on services to multiple entities safely and reliably, demonstrat­ing that they are capable of providing these services to local choice providers, too,” Shaw said.

But that puts PNM on the hook with the National Electric Reliabilit­y Corp. if something goes wrong, since PNM is the local energy balancing authority that’s regulated by NERC.

“NERC has very high standards on reliabilit­y compliance and they will always come to us,” Martinez said. “They can impose fines of over $1 million per day, and LCEs won’t face that, because they can lean on us as the backstop. If they screw up and create problems for us, we’re on the hook.”

Allowing new LCEs to emerge around the state could create a patchwork of local utilities connected to PNM’s grid, making PNM’s energy balancing responsibi­lities more difficult, said PNM President and Chief Operations Officer Don Tarry.

“Energy reliabilit­y is the cornerston­e,” Tarry recently told the Journal’s Editorial Board. “Managing the grid is critical and could become very difficult with this checkerboa­rd approach.”

 ?? CHANCEY BUSH/JOURNAL ?? Melvin Platero, transmissi­on operator, works in the control room at Public Service Company of New Mexico’s power operations center in the South Valley on Feb. 14. The center monitors the grid 24/7 to continuous­ly balance supply and demand.
CHANCEY BUSH/JOURNAL Melvin Platero, transmissi­on operator, works in the control room at Public Service Company of New Mexico’s power operations center in the South Valley on Feb. 14. The center monitors the grid 24/7 to continuous­ly balance supply and demand.
 ?? CHANCEY BUSH/JOURNAL ?? Ian Dunn, system operator, works in the control center for generation and transmissi­on operations for PNM.
CHANCEY BUSH/JOURNAL Ian Dunn, system operator, works in the control center for generation and transmissi­on operations for PNM.
 ?? ?? Kelsey Martinez, manager of regional transmissi­on organizati­on and markets, inside the control center for generation and transmissi­on operations for PNM in Albuquerqu­e’s South Valley.
Kelsey Martinez, manager of regional transmissi­on organizati­on and markets, inside the control center for generation and transmissi­on operations for PNM in Albuquerqu­e’s South Valley.

Newspapers in English

Newspapers from United States