Daily Camera (Boulder)

Cone Zones

-

• 30th Street and Colorado Avenue underpass project: Left turns will be restricted westbound, eastbound and southbound for underpass constructi­on. Sidewalk detours where noted; use temporary crossings at 30th/ Euclid Avenue and Colorado west of the intersecti­on. Cyclists merge with traffic. Northbound bus stop on 30th (BOUND) is closed; board at next stop. Anticipate­d to end March 31.

• Hill Hotel: Westbound Pleasant is open for local traffic from Broadway to the alley. The eastbound lane is closed. This is for demolition of old buildings and waterline and new sewer work. Activity time is 7a.m. to 5p.m. weekdays. Anticipate­d to end Jan. 31, 2024.

Longmont

• Firestone-longmont mobility hub: The Colorado Department of Transporta­tion is constructi­ng the Firestonel­ongmont Mobility Hub at the Interstate 25and Colo. 119 interchang­e. Daytime work hours are expected between the hours of 7a.m. to 7p.m. Monday through Friday, with periodic overnight work. Motorists can expect periodic single-lane closures on Colo. 119and I-25and on-and off-ramp closures, as well as 11-foot lane restrictio­ns on the southbound I-25on-ramp and the northbound off-ramp at Exit 240. The project is expected to be completed by August 2024.

• Longs Peak Avenue: Work on the Price Park Tank Replacemen­t Project is underway. This 18-month-long project is intended to improve water quality and service within the city. Eastbound and westbound lanes on Longs Peak Avenue now run next to each other along the south side of the road between Sunset Street and the entrance to the Sunset Golf Course. Access to Price Park is currently closed and parking in the Sunset Golf Course and Pool parking lot will be limited until next spring. Recreation­al facilities — including Sunset Park, Sunset Pool and Sunset Golf Course — are expected to remain open during constructi­on. There is still two-way traffic, but the existing westbound lane is expected to remain closed and the new traffic pattern to remain in place until the project is completed in spring 2024.

Boulder County

• 71st Street reconstruc­tion project: Boulder County Public Works is planning to reconstruc­t 71st Street between Lookout Road and Colo. 52. Expect full roadway closures between Winchester Circle and Colo. 52while a culvert system is installed under north 71st. There will be intersecti­on closures at Colo. 52and north 71st Street.

• U.S. 287and Colo. 52: The Colorado Department of Transporta­tion will begin safety and traffic flow improvemen­ts at the intersecti­on of U.S. 287and Colo. 52 in Boulder County. Motorists can expect single left-lane closures during the day on both U.S. 287and Colo. 52at the intersecti­on. Right-turn lanes in all directions will be fully closed until further notice. Full access to roadways, area businesses and driveways will be maintained. The project is expected to be completed in October.

Mead

• Weld County Road 7and Colo. 66: Excavation work related to the box culvert extension has begun on the northeast corner of WCR 7 and Colo. 66. The majority of work is expected to occur off the road, but minimal traffic impacts may occur. The culvert extension should be completed by the end of April.

• Weld County Road 13: On Feb. 27, the northbound lane of WCR 13will be closed from Colo. 66to Grand View Circle. The road closure is related to utility work being conducted by United Power. The lane closure is expected to last eight hours, from 8a.m. until 4p.m. Detour route includes CR 91/2, CR 32and CR 17. Detour signage and message boards will be placed around the area.

• Weld County Road 32: On March 6, WCR 32will be closed in both directions west of WCR 13. Weather permitting, the full closure will start March 6and continue through March 17. Detour route includes CR 91/2 and Colo. 66. Detour signage and message boards will be placed around the area. Residents will continue to have access to their property along CR 32during the road closure.

Newspapers in English

Newspapers from United States