Road projects
Interstate 476
July 5 through July 7:
8 p.m. to 5 a.m. Alternating lane closures at the MacDade Boulevard Interchange for paving.
Aqua PA work
July 7 through Aug. 25:
9 a.m. to 3 p.m. Burmont Road in Upper Darby Township will be closed and detoured weekdays between McCoy Street and Marshall Road. During the closure, motorists will be directed to use Garrett Road/Bishop Avenue, Springfield Road and Baltimore Avenue.
PECO
July 5 through Nov. 22:
9 a.m. to 3p.m. Garrett Road closed and detoured weekdays between Clearbrook Avenue and Lansdowne Avenue in Upper Darby Township. During the closure periods, motorists will be directed to use Sherbrook Boulevard, Springton Road, Marshall Road, and Lansdowne Avenue.
Upper Chi roundabout
July 5 through Oct. 23:
Bethel Road and Mill Road intersection will be closed and detoured. During the closure periods, motorists will be directed to
Mill Road, Naamans Creek Road, Larkin Road and Chichester Avenue.
Route 420 project
• Through Oct. 16: 7 p.m. to 5 a.m., a weekday lane closure on Route 291 (Industrial Highway/Governor Printz Boulevard) between Route 420 (Wanamaker Avenue) and Third Avenue in Tinicum Township.
• Into 2027: One southbound lane of the Route 420 bridge over the Darby Creek to be closed 24⁄7 as a four-year project to refurbish and replace that span begins.
Other ongoing projects
• Through July 14: 9 a.m. to 3 p.m., weekday lane closure in both directions on Route 3(West Chester Pike) between Charles Ellis Drive and Winding Way in Newtown Township, for PECO work.
• Through July 31, 9 a.m. to 3 p.m.: Marshall Road in Upper Darby Township closed weekdays between Clearbrook Avenue and Maple Avenue for PECO work. • Through Aug. 3: 9 a.m. to 3p.m. Weekday lane closure on Route 1 (Township Line Road) in both directions between Burmont Road and Reservation Road in Upper Darby Township, for PECO work.
• Through Aug. 3:
9 a.m. to 3 p.m. Weekday lane closure on Route 3 (West Chester Pike) in both directions between Sterner Avenue and New Ardmore Avenue in Marple Township, for PECO work.
• Through early September, 9 a.m. to 3 p.m.:
weekday lane closures on Route 202 (Wilmington/West Chester Pike), both directions, between Smithbridge Road and Watkin Avenue; and Route 491 (Naamans Creek
Road) between Route 202 (Wilmington/West Chester Pike) and Graystone Drive. A second left-turn lane will be installed on southbound Route 202, an additional receiving lane will also be installed on Route 491 (Naamans Creek Road) to handle the increased volume from the new left turn lane from southbound 202. All other lanes within the intersection will remain the same.