Las Vegas Review-Journal

Huge drill set for daily grind

LVCVA aims for ’21 operation of undergroun­d people mover

- By Richard N. Velotta Las Vegas Review-journal

With the flip of a switch Friday, Clark County Commission­er Larry Brown may have turned on a new era of transporta­tion technology.

Brown, who serves as chairman of the Las Vegas Convention and Visitors Authority, and Steve Davis, president of The Boring Co., powered up a massive drill at the bottom of a 40-foot pit that in 14 months will be a station for a $52.5 million undergroun­d people-mover system.

It was somehow appropriat­e that Brown, who also is chairman of the Regional Transporta­tion Commission

of Southern Nevada, got to turn on the machine. Boring and the LVCVA have high hopes that the one-mile system being built beneath and around the Las Vegas Convention Center will lead to a more widespread tunnel network capable of sustaining a subterrane­an transit system that could remove some traffic from Southern Nevada’s surface streets.

But for now, the focus is on getting the people mover running by January 2021 in time for that month’s CES trade show and allowing that technology crowd to get its first look at it.

“We’re excited for what it will do for guests here,” LVCVA President and CEO Steve Hill said. “We’re also excited for what it can do for the destinatio­n as a whole.”

At Friday’s tunnel kickoff event, reporters were escorted down several flights of scaffoldin­g to the floor of tunnel but were not permitted to view or photograph the front of the drill, which is expected to chew through 100 feet of dirt and rock a day.

The tunnel-producing boring machine is instrument­al in developing the first-of-its-kind system from Elon Musk’s Hawthorne, California-based company. It will include about a mile of twin tunnels around 40 feet undergroun­d connected to three stations on the convention center’s 200-acre campus.

Known as the LVCC Loop, the project has been on hold for several weeks as the company and the LVCVA secured building permits from Clark County to tunnel beneath county-maintained streets and to avoid any undergroun­d utilities, sewer lines or drainage tunnels.

In addition to burrowing beneath portions of Swenson Street, Paradise Road and Convention Center Drive, the machine will tunnel below the convention center’s Central Exhibition Hall.

Boring officials say people on the ground above the tunneling won’t even be able to perceive the digging occurring below them.

Once operationa­l, the system will include the use of autonomous­ly operated vehicles.

A walk from one end of the system, at the east end of the South Exhibition Hall, to the southwest corner of the new under-constructi­on West Exhibition Hall would take about 15-20 minutes on foot, and there’s no direct route. The people-mover will cut that time to around a minute and a half.

The vehicles will be supplied by one of Musk’s other companies — Tesla — to transport up to 16 passengers at a time. During heavy operationa­l periods, multiple vehicles can be platooned at one time like a train.

Once the system is working, vehicles on Tesla chassis will maneuver through the tunnels at around 35 mph. Hill said vehicles are capable of running at 150 mph, but there’s not enough tunnel in the LVCC Loop system to warrant that kind of speed.

“We got it up to around 126 mph when we rode the one in Hawthorne,” he said. “It was a blast.”

Hill said that because of the automation of the system, passengers, who will ride for free as convention­eers, will have no lengthy wait times to catch a ride.

If and when the system is expanded community-wide, it probably would be operated commercial­ly by Boring, which would charge passengers as in any transit system.

Hill said he expects convention­eers to be excited to try the new technology when they come to Las Vegas for a conference or trade show. He expects the system will attract attention the same way a new roller coaster draws fans to a theme park.

The people-mover is expected to be less expensive to build than convention­al subway trains because the total diameter of the parallel tunnels, at 28 feet, are less expensive to produce. The interior diameter of a single tunnel is 12 feet with the outer casing at 13.5 feet. Boring officials say the cost will be three to four times less to build than a convention­al transit system.

Davis said he doesn’t anticipate any problems with the potential of caliche deposits or abnormally high water tables.

“You can never say you’re 100 percent positive,” he said. “Nobody ever has perfect knowledge (of the geology).”

But he added that he has worked with seismic challenges in California with the soils there without problems.

Some members of the LVCVA board of directors had some concerns about the system since Boring has not deployed one commercial­ly. The company has built a test tunnel at its Hawthorne headquarte­rs.

The company also has proposals to build similar systems in Los Angeles, Chicago and between Washington, D.C., and Baltimore.

Contact Richard N. Velotta at rvelotta@reviewjour­nal.com or 702-477-3893. Follow @Rickvelott­a on Twitter.

 ?? Benjamin Hager Las Vegas Review-journal @benjaminhp­hoto ?? The tunnel-boring machine sits Friday at a future undergroun­d people-mover station at the Las Vegas Convention Center.
Benjamin Hager Las Vegas Review-journal @benjaminhp­hoto The tunnel-boring machine sits Friday at a future undergroun­d people-mover station at the Las Vegas Convention Center.
 ??  ?? LVCVA President and CEO Steve Hill, right, and The Boring Company President Steve Davis answer questions Friday.
LVCVA President and CEO Steve Hill, right, and The Boring Company President Steve Davis answer questions Friday.

Newspapers in English

Newspapers from United States