STUFF GRAVITY SCREWED UP

-

New beam, sagging ceiling.

The homeowner is reeling with regret that she had not noted and addressed the significan­t sag in the plaster ceiling. But she’s also unhappy that a profession­al cabinetmak­er visited, measured, drew plans, and then built a room-spanning colonnade without accounting for the sag.

“After installati­on, I knew I couldn’t live with the scribed beam,” she says, “and an architect–neighbor was sufficient­ly troubled by the sag itself that he told me I needed a structural engineer.” Undersized joists in the attic floor had bowed, and then the keys in the plaster ceiling pulled away from the joists. At the time of constructi­on, nails rather than screws regularly were used to attach wood lath to joists, and the nails had slipped right out.

A general contractor sistered new joists to the existing ones. He used specialty clips to attach the lath back to the joists. He was able to raise the sagged ceiling two inches (of the total three inches the ceiling bowed at center). This exposed a gap over the scribed beam, which had been cut away to follow the sag.

The cabinetmak­er has since created an overlay trim piece, which is neatly scribed to the ceiling and covers the gap at center. It’s not perfect—but what is, in an old house?

“The lesson,” says the homeowner, “is this: If you have an existing colonnade or any other period trim, leave it be! Because it’s not easy to retrofit a house that has settled.”

 ??  ??