Oroville Mercury-Register

A longer life for Diablo Canyon? Newsom touts nuke extension

- By Michael R. Blood

LOS ANGELES » Facing possible electricit­y shortages, Gov. Gavin Newsom on Friday raised the possibilit­y that the state’s sole remaining nuclear power plant might continue operating beyond a planned closing by 2025, an idea that could revive a decades-old fight over earthquake safety at the site.

The Democratic governor has no direct authority over the operating license for the Diablo Canyon Nuclear Power Plant, which sits on a seaside bluff above the Pacific midway between Los Angeles and San Francisco. But the governor floated the idea that plant owner Pacific Gas & Electric could seek a share of $6 billion in federal funding the Biden administra­tion establishe­d to rescue nuclear plants at risk of closing.

“The Governor is in support of keeping all options on the table to ensure we have a reliable (electricit­y) grid,” spokeswoma­n Erin Mellon said. “This includes considerin­g an extension to Diablo Canyon, which continues to be an important resource as we transition to clean energy.”

PG&E, which in 2016 decided to shutter the plant by 2025, did not directly address Newsom’s suggestion or say whether the company would consider reversing course to seek federal dollars to remain open beyond the scheduled closing.

“We are always open to considerin­g all options to ensure continued safe, reliable, and clean energy delivery to our customers,” PG&E spokeswoma­n Suzanne Hosn said in an email.

Newsom’s office stressed that “in the long term,” the governor continues to support the closure of Diablo Canyon as the state moves to renewable energy. Newsom first disclosed the idea to the Los Angeles Times editorial board.

PG&E announced the closing plan as part of a deal with environmen­talists and union workers in 2016, citing a “recognitio­n that California’s new energy policies will significan­tly reduce the need for Diablo Canyon’s electricit­y output.” But Newsom’s suggestion highlights that the thinking has shifted, as the state looks for reliable power sources amid a changing global climate, while California gradually shifts to solar, wind and other renewables.

Skeptics have questioned whether California’s all-in renewable plan can work in a state of nearly 40 million people.

Newsom’s suggestion comes at a time when President Joe Biden’s approval ratings have fallen sharply, and as the governor seeks a second term in Sacramento with widespread voter angst over inflation, homelessne­ss and rising crime rates. Republican­s routinely attack Newsom for the state’s power problems.

Any proposal to extend the operating life of the plant is certain to revive an extensive battle over the plant’s safety and would involve complex reviews by an array of state and federal agencies.

The issues in play at Diablo Canyon range from a long-running debate over the ability of structures to withstand earthquake­s — one fault runs 650 yards (594 meters) from the reactors — to the possibilit­y PG&E might be ordered by state regulators to spend potentiall­y billions of dollars to modify or replace the plant’s cooling system, which sucks up ocean water and has been blamed for killing fish and other marine life.

Even before the twin reactors produced a single watt of electricit­y, the plant had to be retrofitte­d after a submerged fault was discovered 3 miles offshore during constructi­on.

In 2014, the former chief federal inspector at Diablo Canyon urged regulators to shut down the plant until they can determine whether the twin reactors can withstand powerful shaking from nearby earthquake faults. Regulators later rejected the request.

Erich Pica, president of the environmen­tal group Friends of the Earth, which was part of the deal to phase out the plant, said he was “disappoint­ed that he (Newsom) wants to reopen this conversati­on.”

Given that Newsom — then as lieutenant governor — was part of the effort to close the plant, “It’s surprising,” Pica added.

Research from scientists at Stanford University and the Massachuse­tts Institute of Technology has concluded that delaying Diablo Canyon’s retirement to 2035 would save California $2.6 billion in power system costs, reduce the chances of brownouts and lower carbon emissions.

 ?? MICHAEL A. MARIANT — THE ASSOCIATED PRESS ?? One of Diablo Canyon Power Plant’s nuclear reactors in Avila Beach.
MICHAEL A. MARIANT — THE ASSOCIATED PRESS One of Diablo Canyon Power Plant’s nuclear reactors in Avila Beach.

Newspapers in English

Newspapers from United States