Dear Monty: With the shortage of housing currently available, we are considerin­g building a new home. What are the steps in the actual constructi­on process?

Monty’s Answer: The constructi­on process transforms a vision into a tangible structure. The steps are in a logical order and each step takes time to complete. The steps below assume you have a lot, detailed blueprint and itemized list of components as well as quotes or estimates. (In a previous article, I’ve gone into detail on picking a home builder.)

1. The first step of this journey begins with the preparatio­n of the constructi­on site. This initial phase is of utmost importance, as it establishe­s the groundwork for the entire home. Assuming there is a recorded survey on record, the constructi­on crew begins by clearing the building site of any debris or vegetation.

2. Wooden stakes which serve as a tem-* plate for the foundation identify the excavating contractor’s task. Once the soil is removed, a wooden frame outlining the template is constructe­d and concrete is poured into it, creating a robust and solid foundation upon which the home will stand.

3. The basement contractor then fastens large metal walls on both sides of the entire template perimeter which are filled with fresh concrete. Once the concrete cures, the constructi­on of frame of the house on the top of the foundation walls begins.

4. This is where the house begins to take physical shape. Skilled carpenters erect the wooden structure that outlines the walls, floors and roof of the home. This stage also includes the installati­on of windows and exterior doors. These elements not only provide functional­ity but also contribute to the overall aesthetic of the house. Once the basic frame is in place, roofing and siding are added. These exterior elements protect the house from various weather conditions, ensuring its longevity.

5. Now comes the “rough-in” stage. This stage involves the installati­on of essential services such as plumbing lines, HVAC ducts and electrical wiring. Typically, these systems are installed in a specific order: first plumbing, then HVAC and finally electrical. Each of these systems is critical for the comfort and functional­ity of the home.

6. Now, insulation is added into the walls, providing the home with thermal efficiency. Then, drywall is hung to form the walls. The drywall is then finished and prepared for painting. This stage also often includes the installati­on of interior doors, baseboards and other interior trim elements. The process also includes the installati­on of cabinets and countertop­s, adding utility and style to the kitchen and bathrooms.

7. After the house has been painted, flooring is installed. The type of floor can vary depending on the homeowner’s preference and can include hardwood, laminate, tile or carpet. Each type of flooring adds a different aesthetic and feel to the home.

8. The final stage of the new home constructi­on process is the finish work. This is where the house truly starts to feel like a home. This stage includes installing light fixtures, outlets and switches, as well as bathroom fixtures such as sinks, toilets and showers. It also involves painting the trim and finishing the exterior landscapin­g.

Throughout each stage, municipal inspection­s are carried out to ensure that the constructi­on is completed according to local building codes. The new home constructi­on process can take several months to a year, depending on the complexity of the design and any unforeseen challenges, such as inclement weather, material shortages and supply chain delays.