The Ukiah Daily Journal

Roadwork planned in Mendocino County

-

NEW: ROUTE 1 (33.9/34.9) » AT&T was granted a Caltrans Encroachme­nt Permit for utility work from Philo Greenwood Road to North Limits Elk beginning Thursday, Aug. 19. One-way traffic control will be in effect on Thursday, Aug. 19 and Friday, Aug. 20 from 10 a.m. to 5 p.m. Motorists should anticipate 5-minute delays.

ROUTE 20 (16.5) » Slide removal two miles west of Three Chop Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.

ROUTE 20 (23.7/25.9) » Highway constructi­on east of Three Chop Road will continue. One-way traffic control will be in effect from 7 a.m. to 5:30 p.m. Motorists should anticipate 15-minute delays.

NEW: ROUTE 20 (32.7) » Electrical work at Blosser Road will begin on Monday, Aug. 16. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays.

U.S. 101 (5/5.5) » Slide removal from Comminsky Station Road to Pieta Creek Bridge will continue. Lane closures will be in effect from 6 a.m. to 5 p.m. Motorists should anticipate 5-minute delays.

NEW: U.S. 101 (33.9/39.4) » Emergency work from Uva Drive to Ridgewood Ranch Road will occur on Sunday, Aug. 15. Oneway traffic control will be in effect overnight from 8 p.m. to 6 a.m. Motorists should anticipate 15-minute delays.

U.S. 101 (38/39.4) » Work south of Ridgewood Ranch Road will continue. Lane closures will be in ef

fect in both directions. Motorists should anticipate minor traffic slowdowns.

U.S. 101 (59) » Moss Cove Safety Rest Area will be closed through Fall 2021.

U.S. 101 (82.5) » Empire Camp Safety Rest Area will be closed through Fall 2021.

U.S. 101 (103.8/106.8) » Drainage work from Piercy to the Humboldt County Line will continue. Lane closures will be in effect weekdays. Motorists can anticipate minor traffic slowdowns.

U.S. 101 (103.8) » Drainage work at the Piercy on and off ramp will continue. Full ramp closures will be in effect weekdays from 7 a.m. to 5:30 p.m. Motorists should use an alternate ramp.

ROUTE 175 (5.4/5.5) » Shoulder work east of Buckman Drive will continue. Oneway traffic control will be in effect weekdays from 6 a.m. to 8 p.m. Motorists should anticipate 10-minute delays.

ROUTE 271 (19.6/22.6) » Drainage work from Old Route 101 to South Fork Eel River will continue. Oneway traffic control will be in effect weekdays from 7 a.m. to 5:30 p.m. Motorists should anticipate 5-minute delays.

Newspapers in English

Newspapers from United States