Yuma County Road Report

- FarWest Storm Drain Improvemen­t Project What’s New...

South Frontage Road: Fortuna Road to Foothills Blvd. Overlay What’s New... Yuma County is constructi­ng a new pavement overlay as well as widening segments of the South Frontage Rd to provide for new turn lanes.

South Frontage Rd: 02/11/19 thru 02/13/19: Contractor will be working on grading new ABC shoulders between Foothills Blvd and Scottsdale Drive.

02/14/19 thru 2/15/19: Contractor will complete temporary striping and signing over new roadway.

Traffic Control: Motorist should expect short term delays while work is taking place since contractor will be using a flaggers to control vehicular traffic . Use of alternate routes is recommende­d.

FarWest Avenue: 2/11/19 thru 2/15/19: Contractor will be removing existing pavement and grading the intersecti­on to place new Asphaltic Concrete Pavement transition.

Traffic Control: Contractor will be using a flaggers to control vehicular traffic access into Farwest Avenue . Use of alternate routes is recommende­d.

Yuma County is installing a new storm drain system to alleviate flooding at several locations in the Foothills. The contractor is currently working at the following locations: Hunter Avenue, between Patricia

Drive & Brenda drive: 02/11/19 thru 02/15/19: Contractor will be grading roadway for new pavement. Road will be closed to thru traffic. Detour will be installed thru 34th Street. Hunter Avenue, between Brenda drive & Tanja Drive: 02/11/19 thru 02/13/19: Southwest Gas will be boring this segment and will abandon existing gas line. Once SWG completes their work contractor will be working on completing storm drain catch basins, Road will be closed to thru traffic, but detour will be provided thru Tanja Drive & 34th Street. Renee Avenue, between

34th St & 36th Street: 02/11/19 thru 02/13/19: Contractor to continue grading roadway for new pavement, Renee Avenue to be opened to traffic on 02/15/19. Road will be closed to thru traffic, detour will be thru Cassidy Drive and Patricia Drive to Farwest Avenue. Bonnie Avenue at 36th Place: 02/11/19 thru 02/15/19: Contractor has two undergroun­d crews installing Storm Drain pipeline, one crew is working on Bonnie Avenue and second crew along 36th Place. Intersecti­on will be closed to thru traffic while the contractor is working on this segment. Detour is in place around 37th Street & Hunter Avenue.

Road Closures: Motorists can expect delays as several crews are conducting work, drivers are urged to pay close attention to work zone signs. Traffic control will be in place to detour traffic around road closures.

Utility work: Southwest Gas is in the process of replacing gas lines at Hunter Avenue, Bonnie Avenue, and 34th Street. Utility contractor will be coordinati­ng with County to maintain detour routes accessible while their work is taking place. GRAVEL ROAD MAINTENANC­E: Route 1: South of Co 8th St & West of Somerton Ave

Route 2: East of Pacific Ave & North of Ave 10E

Alley clean up on Crane St between Pagent Ave and Palm Ave CRACK SEAL AND GRINDING: Foothills Mobile Estates #18, 19, 20, 21, 22, 24-East of Foothills Blvd & South of 52nd St GRAVEL ROAD MAINTENANC­E: Route 1: South of Co 8th St & West of Somerton Ave

Route 2: East of Pacific Ave & North Ave 10E

Alley clean up on Crane St between Pagent Ave and Palm Ave CRACK SEAL AND GRINDING: Foothills Mobile Estates #18, 19, 20, 21, 22, 24-East of Foothills Blvd & South of 52nd St

Finish up Crack Sealing at Foothills Movile Estates by 2/21/19

MOHAWK VALLEY WORK SCHEDULED (02/11/19-02/15/19) GRAVEL ROAD MAINTENANC­E: Route 3: North of Hwy 80 & East of Ave 16E to Ave 22E

Route 4: North of Hwy 80 & East of Ave 40E to Ave 45E OTHER: Patching roads as needed Repair mixing table at Ave 38E pit MOHAWK VALLEY WORK SCHEDULED (02/18/19-02/22/19) GRAVEL ROAD MAINTENANC­E: Route 3: North of Hwy 80 & East of Ave 22E to Ave 40E

Route 4: North of Hwy 80 & East of Ave 45E to Ave 57E OTHER: Patching roads as needed SIGNAL MAINTENANC­E WORK SCHEDULED (02/11/19-02/15/19) PREVENTIVE MAINTENANC­E: Fortuna Rd & 28th St Foothills Blvd & 48th St Hwy 95 & Co 15th St Ave C & Co 14th St Somerton Ave & Co 18th St SIGNAL MAINTENANC­E WORK SCHEDULED (02/18/19-02/22/19) PREVENTIVE MAINTENANC­E: Fortuna Rd & 35th Pl Fortuna Rd & 28th St Hwy 95 & Cocopah Entrance Hwy 95 & Co 19th St Ave 3E & Hwy 95

 ??  ??