Yuma County Road Report

- BY YUMA COUNTY

MARTINEZ LAKE RD / CIP 1.1701 RED CLOUD MINE RD

General Descriptio­n: Work is located in the martinez Lake area. Work includes roadway improvemen­ts to martinez Lake rd from the rural metro Fire Station at Fisher’s Landing and extending southerly approximat­ely 6.25 miles past Yuma Proving Ground Jump School. Work along red Cloud mine rd will extend from the intersecti­on of martinez Lake rd and extend northerly for about 2.1 miles. road Improvemen­ts include grading, paving, drainage improvemen­ts (box culverts) and smoothing out the vertical alignment to improve safety and provide all weather access.

• estimated Completion date april 2021

• Project Contractor Intermount­ain West Constructi­on Company

• Constructi­on Cost: $18,327,659.30

Master Schedule: earthwork operations on red Cloud mine road completed. earthwork started on martinez Lake road. expect 20 to 30 minute delays. There will be a single lane closure with flaggers and a pilot car will be utilized as needed

The box culvert work will be ongoing on martinez Lake road with the current detour in place. Possible one lane closure with flaggers for installati­on of the HdPe waterline for the pond.

road has been restricted to one lane of traffic, Traffic signal is now in place. Please follow all traffic control devices. delays to be expected.

CO. 11TH ST & SOMERTON AVE SAFETY IMPROVEMEN­TS, CIP

NO. 1.1505.

What’s New: Yuma County will be conducting safety improvemen­ts at

Co. 11th Street and Somerton avenue intersecti­on; the improvemen­ts include installing enhanced warning signs, stop signs, centerline rumble strips, transverse rumble strips, street lighting on existing aPS poles, speed radar signs and miscellane­ous items.

Master Schedule: Contractor has been issued the notice to proceed and is in the process to acquire all materials.

WEEKLY SCHEDULE: 02/08/2021 to 02/12/2021: Contractor commenced work on 12/28/2020. new sign foundation­s placed at several locations. no work scheduled the week of 02/08/2021 to 02/12/2021. COUNTY 15TH ST – AVENUE A INTERSECTI­ON IMPROVEMEN­T

PROJECT CIP NO. 1.9915E

What’s New: a new traffic signal will be installed at the intersecti­on of Co. 15th Street & avenue a, as part of the signal improvemen­ts designated left turn lanes will be provided at all approaches.

The work includes Install Traffic Signals, Street Lights and Traffic Signal equipment, widen roadway for right and Left Turn Lanes and AC Overlay, remove, replace undergroun­d siphon with 36” diameter C-905 pipe, minor irrigation canal modificati­ons to accommodat­e new longer undergroun­d siphon, widen roadway for right and Left Turn Lanes and AC Overlay, Sawcut and remove pavement, minor earthwork and grading.

Master Schedule: Contractor mobilized on monday november 23,2020. For the first phase of work contractor commenced work on south side of intersecti­on. Contractor will be removing irrigation siphon, removing existing pavement and grade roadway for new road improvemen­ts. during second phase of work, contractor will be installing new traffic signal poles, widening intersecti­on and completing intersecti­on reconstruc­tion.

WEEKLY SCHEDULE:

DPE Constructi­on:

02/08/2021 to 02/12/2021: Contractor completed pavement widening at north, South, east and West side of intersecti­on of Co. 15th St & avenue a. new asphaltic Concrete pavement overlay is scheduled to be completed between 02/08 and 02/09/21. Temporary striping scheduled for 2/10/21.

Road Closures: 02/08/2021 to 02/10/2021: Contractor to close intersecti­on 02/08/21 thru 2/10/21 in order to complete new pavement overlay. detour will be in place around Co. 16th Street /avenue b & Highway 95.

02/11/2021 to 02/12/2021: no road closures expected. Contractor will be working shoulders and will channelize traffic as needed to complete road work.

YUMA/MOHAWK VALLEY WORK SCHEDULED 2/8/21 to 2/12/21 GRAVEL ROAD MAINTENANC­E: Route 1:

• ave J to ave F

• Co 21st St to Co 19th St

Route 2:

• ave b to ave 4e

• Co 19th St to 24th St

Route 3:

• ave 32e to ave 34e

• Co 9th St to Co 6th St

Route 4:

• ave 42e to ave 47e

• Co 5th St to Co 3rd St

SLURRY SEAL: none

WORK ZONE:

2/10/21 – Thermal truck operation on Scottsdale and 40th St

2/9/21-2/10/21 – Guardrail repair on Hwy 95 & Co 20 3/4

YUMA/MOHAWK VALLEY WORK SCHEDULED 2/15/21 to 2/19/21 GRAVEL ROAD MAINTENANC­E: Route 1:

• ave J to ave F

• Co 19th St to Co 17th St

Route 2:

• ave ½e to ave 9e

• Co 10th St to Laguna dam rd Route 3:

• ave 34e to ave 36e

• Co 9th St to Co 6th St

Route 4:

• ave 46e to ave 57e

• Co 3rd St to Palomas rd SLURRY SEAL: none

WORK ZONE: none

SIGN SHOP & SIGNAL MAINTENANC­E WORK SCHEDULED 2/8/21 to 2/12/21

SIGN MAINTENANC­E:

Route 1:

• Co 13th from ave F to ave H

• Co 12th from ave F to ave H

• Co 12th from ave F to ave G

• ave F from Co 11th St to Co

13th St

• ave G from Co 11th St to Co 13th St

• ave H from Co 12th St to Co 13th St

Including all other road segments within these areas

Route 2:

• 24th St from Fortuna rd to Camino del Sol

• 28th St from Fortuna rd to Camino del Sol

• S Frontage rd from Fortuna rd to ave 15e to Via Salida

• ave 11½e from 24th St to

28th St

• alameda ave from 24th St to 28th St

• Hensleys blvd from S Frontage rd to Via Canada

• Via Salida From S Frontage rd to Calle de Cid

Including all other road segments within these areas

Route 3:

• ave 39e from Co 6th St to Co 3¼ St

• ave 40e from Hwy 80 to Co 3¼ St

• Co 6th St from ave 38e to ave 40e

• Co 5th St from ave 38e to ave 40e

• Co 4th St from ave 38e to ave 40e

Including all other road segments within these areas

PREVENTIVE MAINTENANC­E:

• Foothills blvd & 48th St

• Foothills blvd & 44th St

• Foothills blvd & 40th St

• Foothills blvd & 38th St

• Fortuna rd & 28th St

• Fortuna rd & 36th Pl

• Fortuna rd & 40th St

• Fortuna rd @ railroad Crossing

• S Frontage rd & Payson dr

• S Frontage rd & Fry’s

SIGN SHOP & SIGNAL MAINTENANC­E WORK SCHEDULED 2/15/21 to 2/18/21

SIGN MAINTENANC­E:

Route 1:

• Co 10th from ave G to ave F

• ave G from Co 11th St to Co 10th St

• Co 9th from West of ave F to ave d

• ave F from Co 9th St to Co

11th St

• Intersecti­on of ave e from Co

9th St

Including all other road segments within these areas

Route 2:

• Fortuna dr from ave 14e to ave 14½e

• Suzanne de Fortuna rd from ave 14e to ave 14½e

• ave 14e from S Frontage rd St to Fortuna dr

• ave 14½e from S Frontage rd to Fortuna dr

• 28th St from west end off of ave 14e to ave 14½e

Including all other road segments within these areas

Route 3:

• ave 45e from Hwy 80 to Co

2nd St

• ave 47e from Co 2nd St to Co 5th St

• Co 4th St from ave 44e to ave 47e

• Co 2nd St from ave 44e to ave 47e

• Co 5th St from ave 44e to ave 47e

• ave 42e from Hwy 80 to Co

7th St

• Co 8th St from ave 42e to ave 43e

• ave 43e from Co 8th St to Co 6½ St

Including all other road segments within these areas

PREVENTIVE MAINTENANC­E:

• Co 8th St & ave C

• Co 5th St & ave b; ave

• ave 3e & Hwy 95

• engler ave & Hwy 95

• 32nd St & ave 3e

• Cocopah & Hwy 95

• Hwy 95 & ave G

• Co 18th St & Somerton ave

• Co 19th St & Hwy 95

• ave b & 28th St

• ave b & Co 19th St