North Frontage Road from Avenue 10E to Fortuna Road Reconstruc­tion

Yuma county will reconstruc­t north Frontage road to a 3-lane road with curb, sidewalk and bicycle lanes from avenue 10E to Fortuna road. In addition, a storm drain system will be installed to direct storm water runoff to two retention basins. constructi­on began in July 2023. north Frontage road is expected to remain open for most of the constructi­on, although road closures will be scheduled for certain portions of the work. Vehicular traffic is now shifted to new pavement surface on north side of roadway. contractor will commence storm drain work on south side of n. Frontage road am will proceed moving toward Fortuna rd.

Road Closures:

Avenida compadres will be closed to thru traffic. Emergency access and access to local traffic to be provided at all times by contractor.

LOS AMIGOS AND SOUTHERN SANDS DRAINAGE AND PAVEMENT IMPROVEMEN­TS

This project will include a new storm drain system along avenida compadres and valley gutters in Los amigos. all roads in the Southern Sands & Los amigos Subdivisio­ns will have the existing surfacing removed and new aggregate base course and new asphaltic concrete Pavement installed along with some miscellane­ous items. contractor to continue work in Los amigos, Southern Sands and avenida compadres. For the first portion of the work contractor will be installing storm drain along avenida compadres, grading side streets at Los amigos and completing concrete valley gutters.

RED CLOUD MINE ROAD

Roadway improvemen­ts begin at martinez Lake road and extend northeast 2.1 miles to Snipe road. From Snipe road a new alignment roadway was constructe­d for 1.1 miles to connect to Wildlife Way. The length of the project is 3.2 miles. road improvemen­ts include grading, paving, drainage improvemen­ts (box culverts), and smoothing out the vertical alignment to improve safety and provide all weather access.

This project is complete except for one-half mile section, which was not constructe­d in accordance with the specificat­ions. The Federal highway administra­tion (Fhwa) has engaged a contractor to make the required repairs to the pavement structure. The project will also include steel plates on the cattle guards to reduce vibrations and noise. It is anticipate­d the contractor will start work on april 2, 2024.

YUMA/MOHAWK VALLEY WORK SCHEDULED (03/25/24 – 03/29/24)

YUMA EAST SECTION MAINTENANC­E:

Route 1: 40E to 43E from hwy 80 to co. 5th St.

Route 2: 42E to 45E from hwy 80 to co. 5rd St.

Route 3: 53E to 56E from co. 2nd St. to the end of the right of way

YUMA WEST SECTION MAINTENANC­E:

Route 1: co. 18th St. to co. 21st St. between ave J to ave F

Route 2: co. 12th St. to co 16th St. between ave h to ave B

CRACK SEAL: assisting central Section, Foothills mobile Estates # 28 Subdivisio­ns

SHOP & SIGNAL MAINTENANC­E WORK SCHEDULED (03/25/24 – 03/29/24)

Route 1: ave 2E from co. 14th

St. to co. 18th St.

Ave 3E from co. 19th St. to 40th St.

Co 13th St. from carlota ave to ave c

Julie Ln. from hwy 95 to collins Pl.

40th St. from ave 3E to ave 3E ave 4E from co 17th St. to 40th St.

Hwy 95 from East of ave 3E to Pacific ave co. 19th St. from ave 1E & ave 4E ave 5E from co. 16th St. to 40th St. co. 19th St. from ave 2E & ave 4E co. 18th St. from ave 2E & ave 4E co. 17th St. from ave 2E & ave 4E co. 16th St. from ave 2E & ave 4E co. 15th St. from ave 2E & ave 5E co. 14th St. from ave 2E & ave 7E co. 13th St. from ave 3E & ave 5E Including all other road segments within these areas

Route 2:

Foothills Blvd from 44th St. & 48th St. ave 14E from 44th St. to 48th St. Joleane ave from 44th St. to 48th St. montana ave from 44th St. to 48th St.

El camino del diablo from 44th St. to 48th St.

Ironwood dr. from 44th St. to 48th St.

Hunter ave from 44th St. to 48th St.

Including all other road segments within these areas

Route 3:

Co. 3rd St. from hwy 95 to co. 3rd St. ave 16E to South of co. 4th St. co. 4th St. from ave 16E to ave 18E covering north of ave 17E & ave 18E

Ave 18E from north of co. 4th St. to co. 6th St. covering East & West of co. 5th St.

Co. 6th St. from ave 18E to East end of ave 19E

Ave 19E from north of co. 6th St. to co. 8th St.

Ave 20E from north of co. 7th St. to historic hwy 80 covering West of co. 8th St.

Co 9th St. & West of historic hwy 80 back to Ligurta

Including all other road segments within these areas

PREVENTIVE MAINTENANC­E:

Co. 22nd St. & ave F main St. & cesar chavez main St. & urtuzuaste­gi St. archibald St. & urtuzuaste­gi St. W. Brooks & chavez

8th ave & main St. co. 21st St. & main St. main St. & Piceno dr.

WORK ZONE: Each section will respond