Yuma Sun

City Road Report

-

BY THE CITY OF YUMA

a weekly summary of City projects or encroachme­nt permits issued by the City of Yuma affecting busy streets.

North End pavement replacemen­t project

a contractor working for the

City will remove and replace street pavement, water lines, and ada-standard sidewalk ramps on various streets in northern Yuma, roughly between avenue a and 4th avenue. most of the major street reconstruc­tion work is complete; however, work crews will continue to operate in isolated areas. Currently the contractor is raising utility accesses to grade level. The overall project is expected to conclude in summer 2024.

Avenue 5E, 37th Street to 40th Street

a contractor working for the

City is installing water and sewer lines on avenue 5E between 37th Street and 40th Street, plus new fire hydrants and new service connection­s, followed by pavement replacemen­t. avenue 5E will be closed to through traffic between 32nd Street and 40th Street, and to all traffic between 37th Street and 40th Street. detour using avenue 4E or avenue 6E. pavement work will take place april 8-9. This project is expected to be complete by late april or early may.

45th Avenue, 24th Street to 28th Street

a contractor working for the

City will construct a multi-use path along 45th avenue between 24th Street and 28th Street. most work will occur off the roadway; however, one phase of the project will prompt a closure of 45th avenue between 24th Street and 26th Street. The project is expected to run through mid-april.

28th Drive, 31st Street to 29th Place

28th drive traffic is restricted to northbound only between 31st Street and 29th place for emergency storm drain repair.

Spring pavement preservati­on

Spring surface treatments are expected to run through the end of april. impacted neighborho­od property owners will receive a door hanger that indicates the area where the roadway maintenanc­e is taking place as well as the dates and times. Find a complete list of roadways and subdivisio­ns to be preserved on the pavement preservati­on page of the City’s website. This page provides an interactiv­e map where residents can zoom in on highlighte­d streets and click for that street’s scheduled maintenanc­e date.

Oil Seal April 15

Kerley ranch subdivisio­n: • 36th place from Francesca

Way to east end cul-de-sac.

• 36th lane from Francesca Way to east end cul-de-sac.

• 37th lane from Francesca Way to east end cul-de-sac.

• 37th Street from Francesca Way to Victoria Way.

April 16

Citrus View subdivisio­n:

• 33rd place from Kinnow avenue to minneola avenue.

• 33rd lane from Kinnow avenue to minneola avenue.

• 34th Street from minneola avenue to 5000 block of 34th Street.

April 17

Citrus View subdivisio­n:

• minneola avenue from 33rd place to 34th Street.

• 34th Street, from 5000 block to avenue 5-1/2E.

April 18

• maple avenue from 16th Street to 17th Street.

April 19

• 16th Street from 1st avenue to maple avenue.

CITY STREET MAINTENANC­E

City Street maintenanc­e operations for march 25-31 will take place in the following areas:

Streets Concrete Sidewalk Repair

• Villa Hermosa subdivisio­n

• Westridge Estates subdivisio­n Street Asphalt Patching

• County 17th Street from avenue 1E to avenue 4E

• avenue 1E from County 16th to County 17th Street

Streets Lane Striping

• Castle dome avenue from 8th Street to Yuma palms parkway

• pacific avenue, 12th Street to 17th Street

• 24th Street from 4th avenue to avenue a

OTHER UTILITY PROJECTS AND ENCROACHME­NT PERMITS Avenue A, Parkview to 28th Street (Yuma County)

a contractor working for Yuma County is working on the Smucker park flood control basin, which will at times affect avenue a between parkview loop and 28th Street.

The sidewalk on the west side of avenue a is closed. motorists on avenue a should be aware of trucks entering and exiting the roadway on the north side of the park. later phases of work will include lane restrictio­ns on avenue a and a closure at Westridge, anticipate­d for early 2024. message boards will be activated 72 hours prior to any such closure. Concrete pouring is expected at 28th Street and avenue a on april 9.

Fiber optic installati­ons (Allo)

Communicat­ions line installati­ons will take place in areas designated for utility easements within the City limits and surroundin­g vicinity in the following areas:

• avenue B, 8th Street to 3rd Street

• area between avenue B and 15th avenue, from West main Canal to 8th Street

• area between 1st Street and Giss parkway, 4th avenue to Gila Street

• area between 12th Street to 14th Street, pageant avenue to

44th avenue

• 24th Street and Kennedy lane

• las Casitas subdivisio­n

• The dunes subdivisio­n

• areas surroundin­g 8th Street to 47th drive, including donovan Estates

• 32nd Street between avenues 6E and 8E

• avenue C and 16th Street

• Gila ridge road, east toward avenue 6E

• area between 2nd Street and 6th Street, magnolia to 13th avenue

• area between 16th Street and 20th Street, from avenue a to 5th avenue

• 3rd Street west of 15th avenue

• Hettema Street

Avenue 8-1/2E, 34th Street to 40th Street (Gila Electronic­s)

installati­on of new fiber optic cables will require a lane shift on southbound avenue 8-1/2E between 34th Street and 40th Street through late april.

Maiden Lane, 1st Street to 2nd Street (Yuma County)

installati­on of a constructi­on crane will prompt the closure of maiden lane between 1st Street and 2nd Street.

Avenue B, 15th Street (Century Link)

Century link has a 60-day project that will include a closure of the right southbound lane of avenue B approachin­g 15th Street. Work is expected to conclude by mid-may.

24th Street, Pacific Avenue to Avenue 3E (SW Gas)

Gas line replacemen­t work will include eastbound lane closures of 24th Street between pacific avenue and avenue 3E. Work should complete in late april.

Riley Avenue B, 17th Street to 18th Street

riley avenue is currently closed between 17th Street and 18th Street for constructi­on work.

40th Street/ County 12th Street, Avenue 5E (APS)

aps pole and line work will require lane closures at 40th Street/ County 12th Street at avenue 5E the week of april 29 through may 3. Traffic will be regulated by flag persons.

Arizona Avenue, 25th Street (SW Gas)

Gas valve maintenanc­e work will require a 15-day lane restrictio­n on arizona avenue at 25th Street. Work should conclude by June 5.