Edmonton Journal

TRAIL CONSTRUCTI­ON PROJECTS FOR 2018

-

Wolf Willow: Erosion repair for trails coming down from the neighbourh­ood, on the access road and the north bank of the North Saskatchew­an River. Patricia Heights: Planning and constructi­on to realign and upgrade the gravel trail at 159 Street. Whitemud Creek: Major rehabilita­tion on the lower reaches of the creek, including bank and trail repairs near 51 Avenue, north of Snow Valley Ski Club and at pedestrian bridge 283. Rebuilding the boardwalk near Butchart Drive to repair ice damage and eliminate the need for stairs.

Blackmud Creek: Work to stabilize the bank near Blackburn Drive and the Blackmud Creek bridge.

Laurier Park: Viewing decks are scheduled to be constructe­d in 2018, along with minor trail reconnecti­ons. MacKinnon Ravine: Design work and constructi­on to address flooding across the path.

Queen Elizabeth Park: Rehabilita­tion of the Laurence Decore lookout and final work on the Indigenous art park. Nellie McClung Park: Further monitoring, including with geotechnic­al instrument­s, to determine if the current landslide conditions make reconstruc­tion feasible.

Mill Creek Ravine: Realignmen­t for three trails affected by erosion and further constructi­on to address a landslide damaging the Vogel Hill access roadway.

Capilano Park: A new retaining wall and slope reconstruc­tion is needed to reopen the trail west of Capilano Crescent and 65A Street.

Goldbar Park: The trail north of 101 Avenue will be rerouted upslope to avoid erosion near the creek.

Newspapers in English

Newspapers from Canada