Lifting Livingstone
An excavator operator collects pieces of asphalt to be dumped into a tandem dump truck as road construction workers go about their work resurfacing Livingstone Street at the corner of Long’s Hill Friday afternoon.
An excavator operator collects pieces of asphalt to be dumped into a tandem dump truck as road construction workers go about their work resurfacing Livingstone Street at the corner of Long’s Hill Friday afternoon.